Laserfiche WebLink
W Ben_iam:n Holt Drive <br /> �ree5 ■ <br /> N Bound <br /> 1-5 Off- <br /> Ramp Concrete Block Wall <br /> 125 feet to ° <br /> c <br /> Benjamin Holt <br /> Drive ARCO 2133 Recovery Well o <br /> �o30 ■ <br /> Underground <br /> Proposed Storage <br /> Monitoring Well ■ Tanks <br /> Tree ■ ' ■ <br /> 0 <br /> Residential <br /> ■ Existing Groundwater Monitoring Well <br /> North + Proposed Groundwater Monitoring Well <br /> 5cale• V= 40' <br /> Figure i Proposed Groundwater Monitoring Well Location in Caltrans Right-of-way, <br /> ARCO Station 2133, 6enjamin Holt Drive and 1-5, Stockton <br />• <br />