My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000473
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
3500 - Local Oversight Program
>
PR0544111
>
ARCHIVED REPORTS XR0000473
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 3:37:43 PM
Creation date
2/7/2019 2:29:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000473
RECORD_ID
PR0544111
PE
3528
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
02
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
{ Mr Chuck Carmel <br /> September b, 1994 <br /> Page 3 <br /> a GWES and operated periodically from 1985 to 1991 Additional modifications were made <br /> to improve the system in 1991, and it has been operated nearly continuously since June 1991 <br /> Operating Conditions This Quarter During the second quarter of 1994, the system <br /> operated 100 percent of the time During operation of the GWES in the second quarter of <br /> 1994, approximately 1 15 million gallons were extracted and discharged The total amount <br /> of BTEX and TPH in the extracted groundwater is shown in Table 4 The quantity of B= <br /> and TPH discharged to the sewer is well within the limits stated to the permit <br /> A soil vapor extraction/air sparge system has been designed for this site to enhance the site <br /> remediation The system will incorporate the newly installed vapor extraction and air sparging <br /> wells ARCO has awarded a construction contract for the installation of the soil vapor <br /> extraction/air sparge system, and construction should begin in the third quarter of 1994 <br /> SUMMARY OF WORK <br /> Work Completed in Second Quarter 1994 <br /> • Continued monitoring of the GWES, including sampling of the system <br /> • Prepared and submitted first quarter 1994 groundwater monitoring and remediation <br /> system evaluation report. <br /> • Sampled site groundwater momtonng wells for second quarter 1994. Sampling <br /> performed by GTI <br /> • Prepared work plan for installing new soil vapor extraction and spargrng wells at the <br /> site <br /> • Prepared wastewater discharge report to the City of Stockton <br /> Work Anticipated During Third Quarter 1994 <br /> • Continue monitoring and optimizing of the GWES, including sampling of the system. <br /> Reduce the pumping rate of the extraction well to approximately 8 gpm <br /> • Prepare and submit second quarter 1994 groundwater monitoring and remediation <br /> system evaluation report <br /> Use or disclosure of data contained on this sheet is subject to the restriction specified at the beginning of this <br /> document <br /> 12731R.EP0RTSUND94Q7R.RPr <br />
The URL can be used to link to this page
Your browser does not support the video tag.