Laserfiche WebLink
n� <br /> Mr Chuck Carmel <br /> June 21, 1994 <br /> Page 4 <br /> SUMMARY OF WORK <br /> Work Completed First Quarter 1994 <br /> • Continued monitoring of the GWES, including sampling of the system <br /> • Prepared and submitted fourth quarter 1993 groundwater monitoring and remediation <br /> system evaluation report <br /> • Sampled site groundwater monitoring wells for first quarter 1994 <br /> • Prepared work plan for installing new soil vapor extraction and spargiing wells at rhe <br /> site <br /> • Prepared wastewater discharge report to the City of Stockton <br /> Work Anticipated During Second Quarter 1994 <br /> • Continue monitoring and optimizing of the GWES, including sampling of the sytem <br /> Reduce the pumping rate of the extraction weU to approxunately S gpin <br /> • Prepare and submit first quarter 1994 groundwater monitoring and remediation system <br /> evaluation report <br /> • Sample groundwater monitoring wells for second quarter of 1994 <br /> • Begin preparation of second quarter 1994 groundwater monitoring and remediation <br /> systems evaluation report <br /> • Prepare wastewater discharge report for City of Stockton <br /> • Submit the revised air permit for the soil vapor extraction/air sparge system <br /> Use or disclosure of data contained on this sheet is subject to the restriction specified at the beginning of this <br /> document <br /> 127T REPORTS\I Sr94QTR.RJ-r <br />