Laserfiche WebLink
Brown ann Cafdwed <br /> Irk <br /> i <br /> 'acramento y <br /> 41 <br /> January 27, 1992 <br /> Mr. Saed Sadredin <br /> Assistant Manager <br /> San Joaquin County Air Pollution Control District <br /> 2321 West Washington, Suite I ' <br /> Stockton, California 95201 017-6660-02/1 <br /> Subject: Vapor Extraction Pilot Test Plan of Soil Containing Petroleum Hydrocarbons. <br /> ARCO Station 2133, Stockton. California <br /> Dear Mr. Sadredin: <br /> Brown and Caldwell Consultants (BCC) is planning to conduct a soil vapor extraction pilot test <br /> at ARCO Products Company (ARCO) Station 2133 located at 2908 Benjamin Hoit Drive it. i <br /> Stockton, California. The purpose of a pilot vapor extraction test is to: (1) determine the <br /> feasibility of designing a soil vapor extraction and treatment system, and (2) determine the <br /> concentrations of gasoline based hydrocarbons,tetraethyl lead,and chlorinated'solvents in the soil f <br /> vapor. This letter represents our soil vapor extraction pilot test plan. <br /> I <br /> Pilot Test Equipment <br /> The equipment that will be used to conduct the pilot test consists of a portable vacuum pump ' <br /> driven by a 5-horsepower motor. A trailer-mounted generator, driven by a diesel engine, will <br /> provide electrical power to the motor. The vacuum pump assembly and generator equipment will <br /> be provided by BCC. Soil vapors will be extracted from four vapor extraction wells. <br /> Proposed Pilot Test Schedule <br /> We are proposing to conduct the pilot test some time during the week of February 10, 1992. We <br /> do not anticipate conducting the test for more than one day. <br /> Emission Control <br /> Hydrocarbon emissions to the atmosphere will be controlled with granular activated carbon <br /> (GAC). Two 55-gallon GAC units will be placed in series at the discharge of the vacuum pump. ' <br /> A portable organic vapor meter will be used to monitor the GAC units for breakthrough. If <br /> breakthrough occurs, either fresh GAC units will be installed, or the test will be terminated. <br /> 6660,C0RREsPJX66=i <br />