My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000481
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
3500 - Local Oversight Program
>
PR0544111
>
ARCHIVED REPORTS XR0000481
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 3:48:00 PM
Creation date
2/7/2019 2:36:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000481
RECORD_ID
PR0544111
PE
3528
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
02
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BC <br /> Brown and Caldwell <br /> Consultants I V <br /> E 0 <br /> KL6 <br /> ?23 S Street 9 C T 2 6 ung <br /> . Sacramento <br /> Callomia 95814-7092 <br /> (916)444 0123 ENVIRONMENTAL HEALTH <br /> Q <br /> FAX(916)444 8437 f�EM IT/51:RVI ID�cq <br /> October 22, 1992 <br /> Mr Chuck Carmel <br /> ARCO Products Company <br /> 2000 Alameda de las Pulgas <br /> Post Office Box 5811 <br /> San Mateo, California 94402 017-6673-04/1 <br /> Subject. Status of Groundwater Extraction System, ARCO Station 2133, <br /> Stockton, California <br /> Dear Mr. Carmel. <br /> This letter presents the current status of the groundwater extraction system and the results of <br /> . the groundwater discharge sampling at ARCO Products Company (ARCO) Station 2133, <br /> located at 2908 Benjamin Holt Drive in Stockton, California. Listed below is a chronological <br /> summary of activities related to the discharge of groundwater at the site from August 16 <br /> through September 15, 1992 Table 1 presents a summary of the detected constituents for the <br /> extraction system to date (The complete laboratory reports for this reporting period are <br /> included in Attachment A) <br /> 8/26/92 Collected effluent water sample for laboratory analysis of total petroleum <br /> hydrocarbons (TPH), and benzene, ethylbenzene, toluene and xylenes (BETX) <br /> 9/9/92 Collected effluent water sample for laboratory analysis of TPH, BETX, and metals. <br /> The average flow rate during this period (31 days) was approximately 3.1 gallons per minute <br /> (gpm). The average daily flow was 4,464 gallons. The total volume of water discharged <br /> during the period was 138,600 gallons. <br /> Table 2 presents the average pounds per day of each constituent discharged to the sanitary <br /> sewer. The constituent quantities were calculated using the formula below The quantity of <br /> hydrocarbons being discharged is in compliance with the City of Stockton Wastewater <br /> Discharge Permit issued for this site. <br /> I� <br /> 6673NCCRRESP6673-W 1-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.