My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000488
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
3500 - Local Oversight Program
>
PR0544111
>
ARCHIVED REPORTS XR0000488
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 3:09:46 PM
Creation date
2/7/2019 2:42:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000488
RECORD_ID
PR0544111
PE
3528
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
02
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r�r <br /> n <br /> gown ani Caldwell <br /> Consuitants <br /> 723 5 5ireet <br /> Sacramento <br /> Caiifornia 95814 7692 <br /> 916)444 0123 <br /> FAX(916)44-18437 y " r V <br /> February 20, 1992 <br /> FEB 2 4 1992 <br /> E-NVIRONM NTAL EALTI"t <br /> Mr Chuck Carmel PERMIT/.$ERNICES <br /> ARCO Products Company <br /> 2000 Alameda de las Pulgas <br /> Post Office Box 5811 <br /> San Mateo, California 94402 017-6673-04/1 <br /> Subject. Status of Groundwater Extraction System, ARCO Station 2133, <br /> Stockton, California <br /> Dear Mr Carmel <br /> This letter presents the current status of the groundwater extraction system and the results of the <br /> groundwater discharge sampling at ARCO Products Company (ARCO) Station 2133 located at <br /> 2908 Benjamin Holt Drive 2n Stockton, Califorrna Lasted chronologically is a summary of the <br /> activities related to the discharge of groundwater at the site from December 16 through January <br /> 15, 1992 Table 1 presents a summary of the detected constituents for the extraction system to <br /> date <br /> I <br /> 12/20/91 System restarted after being off for repairs since November 5, 1991 <br /> 1/8/92 Collected effluent water sample for laboratory analysis of total toxic organics <br /> (EPA Method 624 and 625), total petroleum hydrocarbons (TPH), and benzene, <br /> ethylbenzene, toluene and xylenes (BETX), and metals <br /> 1/22/92 Collected effluent water sample for analysis of BETX and TPH Results will <br /> be included in the next monthly report <br /> The average flow rate during this period (31 days) was 4 4 gallons per minute The average <br /> daily flow was 6,270 gallons The total volume of water discharged during the period was <br /> 195,000 gallons <br /> The following calculations show average pounds per day of each constituent discharged to the <br /> sanitary sewer The quantity of hydrocarbons being discharged as an compliance with the City <br /> of Stockton Wastewater Discharge Permit Issued for this site <br /> Q Average flow rate, gpm <br /> C Concentration, µg/1 <br /> W — Average amount of chemical discharged, lbs/day <br /> W = Q x 1,440 x 8 34 x C/(1,000,000,000) = 0 0001 C for Q= 4 4 Qpm <br /> 6673\CORRESP`667304 LIR <br />
The URL can be used to link to this page
Your browser does not support the video tag.