Laserfiche WebLink
l ' <br /> Mr Chuck Carmel <br /> February 20, 1992 <br /> Page 4 <br /> • <br /> The next monthly status letter will include the interval January lb, through February 15, 1992 <br /> Please call me at (916) 444-0123 if you have any questions regarding the groundwater extraction <br /> system at ARCO Station 2133 <br /> Very truly yours, <br /> BROWN AND CALDWELL CONSULTANTS <br /> f <br /> I <br /> Steven D Misner l ipF <br /> Project Manager ��eg�te � d Geologist #3710 <br /> l9 •�+•..f. ■ <br /> SDM LEP orb f ox C IL"I-r- <br /> Enclosure <br /> cc Ms Mary Meays, San Joaquin County <br /> Ms Elizabeth Thayer, Regional Water Quality Control Board <br /> Mr Frank Tucker, City of Stockton <br /> Mr Chris Winsor, ARCO Products Company <br /> 6673\CORRESP667304 LTR <br /> Brown and Caldwell <br /> Consultants <br />