My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001346
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
3500 - Local Oversight Program
>
PR0544111
>
ARCHIVED REPORTS XR0001346
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 3:33:06 PM
Creation date
2/7/2019 2:43:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001346
RECORD_ID
PR0544111
PE
3528
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
02
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
490
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 6 <br /> SOIL BORINGS AND WELL COMPLETIONS <br /> ARCO Service Station#2133&Chevron Service Station#9-0275 <br /> 2908 and 2905 Benjamin Holt Drive <br /> Stockton, California <br /> SCreen <br /> wall � a • _ s ,'SCC@@n x Y'a ,s,c1 r s <br /> + a x e <br /> 4 <br /> Well °Ins'tallatfon t Depth��� Diameter -,Top-�" BottornLength �x ,��_ Gominents <br /> '.;. F �, d Fa w� nrc- ' S i.. �� k F- <br /> ,, Y'; E h; L'E <br /> M I D x `~ Date, a feet b s x inches r A feet ti s fejt b s feet <br /> Remediation Wells <br /> R-1 07/24/84 42 12 9 35 1 26 Groundwater Extraction Well <br /> V-1 10/13/93 24 4 4 24 20 Onsite Vapor Extraction Well <br /> V-2 10/12/93 24 4 4 24 20 Offsite Vapor Extraction Well <br /> V-3 10/12/93 24 4 4 24 20 Onsite Vapor Extraction Well <br /> V-4 10/14/93 24 4 4 24 20 Onsite Vapor Extraction Well <br /> V-5 10/18/93 245 4 45 245 20 Onsite Vapor Extraction Well <br /> V-6 10/14/93 23 4 3 23 20 Onsite Vapor Extraction Well <br /> V-7 10/15/93 24 4 4 24 20 Onsite Vapor Extraction Well <br /> _V-8 08/15/94 21 5 2 6 21 15 <br /> V-91S-7 08/15/94 31 5 2 6 21 15 Nested SVE&Air Sparge Well <br /> – — _ — ---1 =27-5=!=30= =2 5==�-- -- <br /> ---- –V-1015-8– —08116194-- – 31 5-- - -- 2-. — - 6–_ _ __21- _ 15-- _ _Nested $VE&Air Sparge Well <br /> —30��2 5— <br /> V-11 08/15/94 21 5 2 5 21 16 Onsite Vapor Extraction Well <br /> V-12 08/16/94 215 2 6 21 15 Onsite Vapor Extraction Well <br /> S-1 10/12/93 24 1 22 24 2 Onsite Air Sparging Well • <br /> S-2 10/13/93 25 1 23 25 1 2 Onsite Air Sparging Well <br /> S-3 10/15/93 25 1 23 25 2 Onsite Air Sparging Well <br /> "S-4 10/15/93 24 1 22 24 2 Onsite Air Sparging Well <br /> S-5 10/18/93 24 1 20 22 2 Onsite Air Sparging Well <br /> S-6 10/19/93 25 1 23 25 2 Onsite Air Sparging Well <br /> S-9 08/16/94 30 1 265 30 35 Onsite Air Sparging Well <br /> 94275 Boring and Well Completions Page 2 of 3 SFCOR <br />
The URL can be used to link to this page
Your browser does not support the video tag.