Laserfiche WebLink
t. <br /> B R 0 W N A ` D pAYMENT <br />� C A L D W E L L RECEIVE® <br /> DF <br /> SAN .IOAQ11A 1-1 ,iVY <br /> December b, 1994 PUBLIC 4��,A=�H Z�FtVICES <br /> ENVIRONNIENTAL HEAL T H 134VISION <br /> Mr Kyle Christie <br /> ARCO Products Company <br /> Post Office Box 5811 <br /> San Mateo, California 94402 017-1506-01/1 <br /> Subject Work Plan for Installation of Oft-Site Groundwater Monitoring Wells, <br /> ARCO Facility 2133, Stockton, California, Site Cade 1021 <br /> Dear Mr Christie <br /> This letter is a work plan for the installation of three ground water monitoring wells off-site <br /> to the south and west of ARCO Products Company (ARCO) Facility 2133 located at 2908 <br /> Benjamin Holt Drive, Stockton, California The purpose of the wells is to define the vertical <br /> and lateral extent of hydrocarbons in the groundwater in the south and southwest direction <br /> Upon approval by ARCO this work plan will be submitted to San Joaquin County and the <br /> California Regional Water Quality Control Board (Regional Board) San Joaquin County <br /> monitoring well permit applications completed in triplicate and a check in the amount of$178 <br /> for application fees are included in this work plan as Attachment A <br /> Upon completion of the field work, a report which will summarize the results of the field <br /> work will be submitted to ARCO in draft tormat Upon approval by ARCO, the report will <br /> be submitted to the County and the California Regional Water Quality Control Board for <br /> approval The work described in this work plan will be conducted under ARCO task order <br /> number 2133-94-2 <br /> Background <br /> Hydrocarbon affected soil and groundwater has been identified at this site and is defined to <br /> the northwest, northeast, east, and southeast The San Joaquin County Health Department <br /> (County) requested further investigation to define the extent of the hydrocarbons oft-site to <br /> the south and southwest of the facility Currently a soil vapor extraction/air sparge system <br /> ypryec-t- --=t> and a groundwater extraction system are in operation at this facility <br /> Proposed Scope of Work <br /> BC will supervise the installation of three two-inch-diameter groundwater monitoring wells <br /> to monitor and sample the groundwater to the south and southwest of the ARCO facility <br /> Figure 1 represents the proposed locations of the monitoring wells Figure 2 represents typical <br />•, monitoring well construction The boreholes will be drilled and wells constructed as described <br /> in Attachment B, Field Procedures Prior to drilling, Underground Service Alert and an <br /> 12t01J1)4%Z 15WREP0RTSNGR0UN DµP Fnvironmenraf Ergrneer,ng Arc COrsulPng AraijbCal Services <br /> Q%IS-PS41a <br /> 9616 %ficRo. a% E\LE P 0 Boy 1 )449 SSCRtNIE\TO Ca 9313 j449 <br /> 19161 444 0123 F,,r [9t6) 3�6 )211 <br />