Laserfiche WebLink
Mr Kyle Christie �} <br /> February 27, 1995 <br /> Page 4 <br /> • Drilled and installed three off-site groundwater monitoring wells Two wells were <br /> installed south of the ARCO facility, and one well was installed west of the ARCO <br /> facility Details of the well installation will be prepared <br /> • Prepared wastewater discharge reports to the City of Stockton <br /> • Source testing of the SVEIAS system - <br /> Work Anticipated During First Quarter 1995 <br /> • Continue monitoring and optimizing of the GWES, including sampling of the system <br /> • Prepare and submit fourth quarter 1994 groundwater monitoring and remediation <br /> system evaluation report <br /> • Prepare source test report and begin continuous operation of SVE/AS system <br /> • Sample groundwater monitoring wells for first quarter of 1995 <br /> • Prepare monthly wastewater discharge reports for City of Stockton <br /> If you have any questions regarding this quarterly report,please contact me at (916) 444-0123 <br /> Sincerely, <br /> BROWN AND CALDWELL <br /> r <br /> Steve Misner Pat G Cullen <br /> Project Manager California Registered Geologist #4932 <br /> SDM PGC ksc <br /> Enclosures <br /> cc Ms Patti DeLaO, Brown and Caldwell <br /> Mr Brett L Hunter, Chevron <br /> Ms Mary Meays, San Joaquin County Health Department <br /> Ms Elizabeth Thayer, California Regional Water Quality Control Board, CVR <br /> Use or disclosure of data contained on this sheet is subject to the restriction specified at the beginning of this <br /> document <br /> 1273\REPORTS4TH94QTR RPT <br />