My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000625
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
3128
>
3500 - Local Oversight Program
>
PR0544112
>
ARCHIVED REPORTS XR0000625
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2019 4:38:11 PM
Creation date
2/7/2019 3:31:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000625
RECORD_ID
PR0544112
PE
3528
FACILITY_ID
FA0005145
FACILITY_NAME
EXXON COMPANY USA
STREET_NUMBER
3128
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09523002
CURRENT_STATUS
02
SITE_LOCATION
3128 W BENJAMIN HOLT DR
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
W QUARTERLY SUMMARY REPORT <br /> Former Exxon Station No, 7-3330 <br /> 3128 West Benjamin Holt Drive <br /> Stockton, California <br /> October 1991 <br /> BRIEF HISTORY <br /> ° The site was an active Exxon Retail Service Station from 1968 to 1991. As a part of <br /> the process of returning the lease to the owner, the service station building was <br /> demolished September 30, 1991. The underground fuel storage tanks, the waste oil <br /> tank, the pumps and product pipelines were removed October 9,1991. <br /> ° Ten soil borings were drilled in 1991. Of these,six were converted into monitoring <br /> wells. These wells were installed and sampled according to the regulatory guidelines <br /> and protocol. <br /> WORK DONE THIS PERIOD <br /> - ° Groundwater sampling was conducted on September 25, 1991.A report presenting <br /> the findings of the groundwater sam lin s attached(Artesian report to Exxon <br /> Company, U.S.A., October 10, 1991)r <br /> x <br /> i ° Station demolition and removal of the underground fuel storage tanks, the waste oil <br /> tank,the pumps and product pipelines. <br /> ° Submission of workplan for site remediation by soil excavation. <br /> PLANNED SITE ACTIVITIES <br /> ° Continuation of quarterly groundwater sampling and analysis. <br /> ° Proper disposal of the purge water acquired during sampling. <br /> ° Site remediation by soil excavation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.