My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000627
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
3128
>
3500 - Local Oversight Program
>
PR0544112
>
ARCHIVED REPORTS XR0000627
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2020 7:51:35 AM
Creation date
2/7/2019 3:32:01 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000627
RECORD_ID
PR0544112
PE
3528
FACILITY_ID
FA0005145
FACILITY_NAME
EXXON COMPANY USA
STREET_NUMBER
3128
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09523002
CURRENT_STATUS
02
SITE_LOCATION
3128 W BENJAMIN HOLT DR
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
View images
View plain text
4L <br /> Page 4 <br /> was estimated by ESI to be about 13 feet below ground surface. According to an ESI <br /> report of April, 1991,groundwater flow direction was estimated to be to the northeast. <br /> On June 18 and 19, 1991, Artesian Environmental Consultants,Inc. (Artesian)conducted a <br /> Phase 11 subsurface investigation at Exxon Service Station 7-3330 at 3128 West Ben Holt <br /> Drive in Stockton,California. The purpose of this Phase 1I Site Investigation was to evaluate <br /> the vertical and lateral extent of the soil hydrocarbons detected in the previous investigation <br /> and the lateral extent of hydrocarbons detected in the groundwater. This investigation only <br /> evaluated on-site soil and groundwater conditions. No off-site sampling was performed <br /> ducting this investigation. <br /> Pour soil borings, B-4 through B-7, were drilled on June 18, 1991 to a depth of 20 feet <br /> below ground surface(Appendix B). Groundwater samples were collected from B-4 <br /> through B-7 using hydropunch sampling equipment. On June 19, 1991, three soil borings, <br /> B-1 through B-3,were drilled on the northern and downgradient boundary of the site, near <br /> the sidewalk on West Ben Holt Drive. Soil borings B-1 through B-3 were subsequently <br /> converted into monitor wells,MW-4 through MW-6,respectively. <br /> Soil samples were collected every five feet during the drilling of the soil borings. Total <br /> petroleum hydrocarbons as gasoline(TPH-g),were detected in soil samples collected from <br /> borings B-4 through B-6 at concentrations of up to 1,100 parts-per-million (ppm)in the <br /> sample from boring B-4 collected at 16 feet below ground surface(Table 1, Figures 3A and <br /> - 3B). This soil sample also contained the maximum concentrations of benzene,toluene, <br /> ethylbenzene and xylenes (BTEX). Hydrocarbons were not detected in soil samples <br /> collected from B-I through B-3 and B-7. <br /> TPH-g concentrations at 120,000 parts-per-billion (ppb) were highest in the hydropunch <br /> groundwater sample from soil boring B-4,located northeast and downgradient from the <br /> underground storage tank area(Table 2 and Figure 4). Concentrations of BTEX were also <br /> highest in hydropunch groundwater sample from boring B-4 (Figure 5). <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).