Laserfiche WebLink
ARTESIAN ENVIRONMENTAL CONSULTANTS, INC. <br /> SITE SAFETY PLAN <br /> This Site Safety Plan has been specifically prepared for the following site: <br /> Project Soil. Excavation/Remediatioci, .Exxon Ret ail _StatiQn_ Ncz. 7-3330 <br /> Site Location 3128 West Benjamin Holt Drive, Stockton, yR <br /> Artesian job Number 014-02-01 / <br /> Plan Prepared By Olivia Jacobs c obs Date / I <br /> -., / Plan <br /> Plan Reviewed By �/Date_ �I 9/ <br /> Plan Revised By Late <br /> PURPOSE OF TIME SITE SAFETY PLAN <br /> ,•A The ur os'e of the Site Safety Plan is to protect personnel in the field. All <br /> P P <br /> ' personnel participating in field work must be trained in the general and <br /> specific hazards unique to the job. All site personnel and visitors shall follow <br /> the guidelines, rules, and procedures contained in this Site Saftey Plan. The <br /> Project Manager or Site Safey Officer may impose additional procedures or <br /> prohibitions that are believed to be necessary for safe operations. <br /> Although this Site Safety Pian is prepared to inform all field personnel of the <br /> potential hazards on the site, contractors and subcontractors must assume <br /> direct responsibility for the health and safety of their own employees. <br /> l <br /> IY <br /> i <br />