Laserfiche WebLink
APPENDIX B <br /> PROJECT 'TEAM RESPONSIBILITIES <br /> PROJECT MANAGER <br /> The project manager shall direct the on-site investigation and operation efforts. The <br />` project manager has the primary responsibility for: <br /> • Assuring that appropriate personnel protective equipment is available and is <br /> properly utilized by all on-site ES personnel. The project manager sha14 also advise <br /> subcontractors as to the necessity and appropriateness of personal protective <br /> equipment and may, if the situation requires, remove subcontractors from the job <br /> for practicing unsafe procedures; <br /> Assuring that personnel are aware of the provisions of this plan and are instructed <br /> in the work practices necessary to ensure safety and the procedures for dealing with <br /> emergencies; <br /> • Consulting with the health and safety coordinator; <br /> • Assuring that personnel are aware of potential hazards associated with site <br /> operations; <br /> • Monitoring the safety performance of all personnel to ensure that the req:,+fired work <br /> practices are employed; <br /> B-1 <br /> ""` 172.19.320 314191 <br />