Laserfiche WebLink
Page 5 <br /> least every 20 feet laterally Samples S-1 through 5-10 were collected to a maximum depth <br /> of 13 0 feet using either a stainless steel sampler connected to a 15 foot rod and slide <br /> hammer, or the bucket of the excavator according to Standard Operating Procedures in <br /> Appendix C Sample collection was witnessed by Ms Linda Turkatte, Registered <br /> Environmental Health Specialist, San Joaquin County Environmental Health Department. <br /> The pit was excavated to the top of groundwater at approximately 14 5 feet below ground <br /> surface Interim remediation of the groundwater included removing 1,800 gallons of <br /> groundwater which was pumped by Erickson from the pit on 20 April 1992, prior to filling <br /> the tank pit with clean fill The liquid was transported to Gibson Oil/Pilot Petroleum Facility <br /> in Redwood City (see Appendix D for the manifest) Soil sampling of the tank pit walls <br /> (total often samples, S-1 through 5-10) was performed on 4 April 1992 Soil was excavated <br /> to the top of groundwater <br /> PUMP ISLAND AREA <br /> On 16 and 30 May 1992, 534 cubic yards of soil were excavated from the pump island area <br /> The soil was screened and segregated in the field using a PID Artesian documented the soil <br /> removal process with field reports and photographs After the removal of soil having <br /> obvious staining, odor or detectable levels of organic vapors as detected on a PID, <br /> confirmatory soil samples in the walls and floor of the excavation were selected at least every <br /> 20 feet laterally Soil samples PI-1 through P1-12 were collected at a depth of 10 0 feet <br /> using either a stainless steel sampler connected to a 15 foot rod and slide hammer or the <br /> bucket of the excavator according to Standard Operating Procedures in Appendix C Mr <br /> Harlin Knoll, Senior Registered Environmental Health Specialist, San Joaquin County <br /> Environmental Health Department, witnessed the sample collection Soils were excavated to <br /> the top of groundwater at approximately 14 feet below ground surface <br /> 1 <br />