Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
Work Plan for Well Closure at Clover Middle School and Tracy High School Page Two <br /> Back round <br /> During the investigation of the site of a former leaking underground storage tank, which <br /> was located at the Clover Middle School, 51 East Beverly, Tracy, California, a water well <br /> which had been previously used for irrigation water was discovered. The well has not <br /> been operated in at least three years. It was installed sometime in the 1950's and is of an <br /> unknown size, probably 12 inches in diameter. The depth is no known but the pump <br /> presently installed over the well is a 15 horsepower vertical turbine pump with a barrel <br /> 110 feet long. At the same time an abandoned well was identified at the Tracy High <br /> School located at 315 East 11th Street, Tracy, California. This well, installed in the <br /> 1930's, was also used for irrigation. It has 12 inch riveted casing. There is no pump <br /> installed in the Tracy High School well at this time but the well depth is unknown. The <br /> Tracy Unified School District has decided to legally close these wells at the earliest <br /> possible date. <br /> Scope of Work <br /> Work will be performed by Dietz Irrigation, a General Engineering contractor with an A <br /> Hazardous Waste license #638281. The well closure work will be performed by <br /> Spectrum Exploration a licensed well drilling contractor with a C57 license #512268. <br /> Work to be performed is as follows: <br /> ❑ A well/pump permit will be obtained from San Joaquin Public Health Services <br /> Environmental Health Division prior to the start of well closure. A copy of this <br /> permit application is attached. Separate permits will be obtained for each well site. <br /> ❑ The vertical turbine pump will be removed at Clover Middle School. The electrical <br /> will be disconnected, pump panels removed and the pump and motor will be disposed <br /> of at a scrap metal dealer for recycling. <br /> ❑ The surface of the water in the well at Clover Middle School will be bailed to <br /> investigate the possible presence of turbine oil in the water. If turbine oil is present, <br /> the well will be bailed, the oily water collected and disposed at an oil recycler. In the <br /> event that there is extensive oil on the surface of the water in the well a vacuum truck <br /> will be brought to the site and the surface of the water will be skimmed to remove any <br /> oil floating on the surface of the water. The contents removed will also be recycled <br /> by an oil recycler licensed for this type of disposal. <br /> ❑ The shed covering the pump at Tracy High School will be demolished and shipped <br /> off site for disposal. <br /> ❑ The depth of each well will be determined by lowering a weighted line to the bottom <br /> and measuring the length of the line. The purpose of determining the depth of each <br /> well is to determine the quantity of grout required for closure. <br />