My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS 1994-2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BEVERLY
>
104
>
2900 - Site Mitigation Program
>
PR0540667
>
WORK PLANS 1994-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2019 8:42:54 AM
Creation date
2/7/2019 4:39:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
1994-2010
RECORD_ID
PR0540667
PE
2960
FACILITY_ID
FA0023252
FACILITY_NAME
WELDON CHURCH PROPERTY
STREET_NUMBER
104
Direction
W
STREET_NAME
BEVERLY
STREET_TYPE
PL
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
104 W BEVERLY PL
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
`Advanced <br /> GeoEnvir ,Aff - - � <br /> 04 January 2000 pN 0 5 2000 <br /> AGE-NC Project No. 95-0106 EJ STAS <br /> NV1 R��TERVIC <br /> ES <br /> PETW <br /> Mr. Ron Rowe <br /> San Joaquin County PHS-EHD <br /> P. O. Box 388 <br /> Stockton, CA 95201 <br /> Subject: Revised Work Plan for Soil and Ground Water Investigation - Addendum <br /> WELDON CHURCH PROPERTY (Church Refrigeration) (t' I <br /> 104 West Beverly Place, Tracy, California <br /> Dear Mr. Rowe: VJ <br /> At the request of Mr. Weldon Church,Advanced GeoEnvironmental, Inc. (AGE) has prepared this <br /> Revised Work Plan for Soil and Ground Water Investigation - Addendum for additional soil and <br /> ground water investigation at the referenced site. The Revised Work Plan Addendum is prepared as 7" <br /> directed by the San Joaquin County Public Health Services - Environmental Health Department <br /> (PHS-EHD) in response to Work Plan for Soil and Ground Water Investigation -Addendum, dated <br /> 02 December 1998. <br /> This Revised Work Plan Addendum supplements the original Work Plan for Soil and Ground Water <br /> Investigation, prepared by AGE in December 1995, which was prepared for backfilling the UST <br /> excavation on the property and advancing six soil probe borings to collect soil and ground water <br /> samples (Figure 1). The work was completed during December 1995. Four subsequent work plan <br /> addendums have been prepared and executed to assess and/or monitor petroleum hydrocarbon- <br /> impacted soil and ground water associated with the release of fuel hydrocarbons from the former <br /> underground storage tank (UST) facility. The subsequent addendums, listed below by preparation <br /> date, were prepared for: <br /> • 12 February 1996: installation of four ground water monitoring wells (MW1, MW2, MW3 <br /> and MW4), which were installed during July 1996; <br /> • 08 January 1997: installation of two additional ground water monitoring wells (MW5 and <br /> MW6), completed during April 1997; and installation of six soil vapor probe borings,which <br /> was subsequently not required by the San Joaquin County Public Health Services - <br /> Environmental Health Division (PHS-EHD); <br /> 4005 North Wilson Way,Stockton,California 95205 <br /> Telephone(209)467-1006 FAX(209)467-1118 <br />
The URL can be used to link to this page
Your browser does not support the video tag.