My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE 2011-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BEVERLY
>
104
>
2900 - Site Mitigation Program
>
PR0540667
>
SITE INFORMATION AND CORRESPONDENCE 2011-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2019 8:26:21 AM
Creation date
2/7/2019 4:56:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
2011-2015
RECORD_ID
PR0540667
PE
2960
FACILITY_ID
FA0023252
FACILITY_NAME
WELDON CHURCH PROPERTY
STREET_NUMBER
104
Direction
W
STREET_NAME
BEVERLY
STREET_TYPE
PL
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
104 W BEVERLY PL
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
188
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Weldon Church - 4 - August 29, 2011 <br /> UPDATED, September 2011, by 1 September 2011 letter, the San Joaquin County LOP <br /> directed the Responsible Party to conduct additional soil vapor sampling and to perform <br /> Johnson Ettinger modeling. The Fund concurs with these actions. <br /> Kirk Larson, P.G. Date Fkobert Trommer, C.H.G. Date <br /> Engineering Geologist Senior Engineering Geologist <br /> Technical Review Unit Chief, Technical Review Unit <br /> (916) 341-5663 (916) 341-5684 <br />
The URL can be used to link to this page
Your browser does not support the video tag.