Laserfiche WebLink
Page 2 of 2 <br /> Good morning, Brian. <br /> I just returned from the Weldon Church Property site located at 104 West Beverly Place in Tracy, <br /> California. I asked Matt if newly installed monitoring well MW-8 was being sampled quarterly. Matt didn't <br /> know the answer to this. MW-8 was installed in August 2010 and should be sampled quarterly for one <br /> year. The only report I have since MW-8 was installed indicates that this well was sampled in December <br /> 2010. Is this well being sampled quarterly? If not, please schedule this well to be sampled quarterly <br /> through the first quarter of 2012. Thank you. <br /> Vicki McCartney, Senior REHS <br /> San Joaquin County <br /> Environmental Health Department <br /> 600 East Main Street <br /> Stockton,California 95202 <br /> Phone: (209)468-9852 <br /> Fax: (209)468-3433 <br /> Email: v rr ccartney,�c,sicelicl.coni <br /> 6/6/2011 <br />