My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS 2011-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BEVERLY
>
104
>
2900 - Site Mitigation Program
>
PR0540667
>
WORK PLANS 2011-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2019 9:14:46 AM
Creation date
2/7/2019 5:02:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
2011-2015
RECORD_ID
PR0540667
PE
2960
FACILITY_ID
FA0023252
FACILITY_NAME
WELDON CHURCH PROPERTY
STREET_NUMBER
104
Direction
W
STREET_NAME
BEVERLY
STREET_TYPE
PL
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
104 W BEVERLY PL
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Weldon Church Site Background Information <br /> Page 6 of 12 <br /> AQUIFER VOLUME TEST <br /> On 17 August 2010, two aquifer volume tests were performed at the site. During the <br /> shallow aquifer test, a total of 161 gallons of potable water was injected between 5 feet and <br /> 12 feet bsg. Approximately 23 gallons of water per foot was injected for an average of <br /> 15 minutes resulting in a calculated flow rate of 1.5 gallons per minute (GPM). At the start <br /> of the shallow injection test, depth to water was measured in well MW-2 at 6.68 feet below <br /> the top of the well casing (btoc). At the completion of the test, depth to water was <br /> measured at 6.65 feet btoc. <br /> During the deep aquifer test, a total of 233.5 gallons of potable water was injected between <br /> 13 and 21 feet bsg. Approximately 30.5 gallons of water per foot was injected for an <br /> average of 18.6 minutes resulting in a calculated flow rate of 1.6 GPM. During the test, <br /> water injection refusal was encountered at 21 feet bsg when water began surfacing. The <br /> aquifer test was terminated at 21 feet bsg and before reaching the proposed depth of <br /> 25 feet bsg. At the start of the deep injection test, depth to water in well MW-2 was <br /> measured at 6.71 btoc. At the completion of the test, depth to water was measured at 6.71 <br /> feet btoc. <br /> SOIL VAPOR SAMPLING <br /> SEPTEMBER 2010 <br /> On 14 September 2010, temporary soil vapor sampling points V-1 through V-5 were <br /> installed on-site to assess the potential for soil vapor intrusion. Soil borings V-1 through V-5 <br /> were advanced to total depths of 5 feet below surface grade (bsg) utilizing a 3-inch <br /> diameter hang auger. Soil samples were not collected during the advancement of the <br /> borings. Soil vapor sampling points V-1 through V-5 were completed using 0.75-inch <br /> diameter, schedule 40 polyvinylchloride (PVC) casing with 0.020-inch slotted well screen <br /> installed from approximately 4.5 to 5.0 feet bsg and with blank well casing extending to the <br /> surface. The filter pack was (#2/12 sand) installed from 4 feet to 5 feet bsg. Following the <br /> filter pack installation, a mixture of Volclay and water was used to fill the void space from <br /> near surface grade to 4 feet bsg. The soil vapor points were completed approximately six- <br /> inches above surface grade and capped. <br /> On 16 September 2010, two soil borings (V-6 and V-7) were advanced near the former <br /> UST area for collection and analysis of soil vapor samples. The borings were advanced <br /> utilizing a van-mounted Geoprobe 5400 direct-push probing unit equipped with 1.25-inch <br /> probing rods. Soil vapor borings V-6 and V-7 were advanced to approximately 5 feet bsg. <br /> Advanced GeoEmironmental,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.