Weldon Church Site Background Information <br /> Page 6 of 12 <br /> AQUIFER VOLUME TEST <br /> On 17 August 2010, two aquifer volume tests were performed at the site. During the <br /> shallow aquifer test, a total of 161 gallons of potable water was injected between 5 feet and <br /> 12 feet bsg. Approximately 23 gallons of water per foot was injected for an average of <br /> 15 minutes resulting in a calculated flow rate of 1.5 gallons per minute (GPM). At the start <br /> of the shallow injection test, depth to water was measured in well MW-2 at 6.68 feet below <br /> the top of the well casing (btoc). At the completion of the test, depth to water was <br /> measured at 6.65 feet btoc. <br /> During the deep aquifer test, a total of 233.5 gallons of potable water was injected between <br /> 13 and 21 feet bsg. Approximately 30.5 gallons of water per foot was injected for an <br /> average of 18.6 minutes resulting in a calculated flow rate of 1.6 GPM. During the test, <br /> water injection refusal was encountered at 21 feet bsg when water began surfacing. The <br /> aquifer test was terminated at 21 feet bsg and before reaching the proposed depth of <br /> 25 feet bsg. At the start of the deep injection test, depth to water in well MW-2 was <br /> measured at 6.71 btoc. At the completion of the test, depth to water was measured at 6.71 <br /> feet btoc. <br /> SOIL VAPOR SAMPLING <br /> SEPTEMBER 2010 <br /> On 14 September 2010, temporary soil vapor sampling points V-1 through V-5 were <br /> installed on-site to assess the potential for soil vapor intrusion. Soil borings V-1 through V-5 <br /> were advanced to total depths of 5 feet below surface grade (bsg) utilizing a 3-inch <br /> diameter hang auger. Soil samples were not collected during the advancement of the <br /> borings. Soil vapor sampling points V-1 through V-5 were completed using 0.75-inch <br /> diameter, schedule 40 polyvinylchloride (PVC) casing with 0.020-inch slotted well screen <br /> installed from approximately 4.5 to 5.0 feet bsg and with blank well casing extending to the <br /> surface. The filter pack was (#2/12 sand) installed from 4 feet to 5 feet bsg. Following the <br /> filter pack installation, a mixture of Volclay and water was used to fill the void space from <br /> near surface grade to 4 feet bsg. The soil vapor points were completed approximately six- <br /> inches above surface grade and capped. <br /> On 16 September 2010, two soil borings (V-6 and V-7) were advanced near the former <br /> UST area for collection and analysis of soil vapor samples. The borings were advanced <br /> utilizing a van-mounted Geoprobe 5400 direct-push probing unit equipped with 1.25-inch <br /> probing rods. Soil vapor borings V-6 and V-7 were advanced to approximately 5 feet bsg. <br /> Advanced GeoEmironmental,Inc. <br />