Laserfiche WebLink
Advanced <br /> GeoEnvironmental, Inc. <br />' ;4005 North Wilson Way,Stockton,C4 95105 •(209)467-1006 •Fax(109)467-1118 <br /> x. Monitoring WelYFiel�d Log <br /> VVeII Data - <br /> Project Name: Weldon church Project No.: Date:2-24-99 <br /> AGE-NC-95-0106 <br /> Pre-Purge DTW: f� qd Time: :�IS Well I.D.: MW- <br /> Post-Purge DTW: d v Time: <br />' Total Depth of Well: Z Well Volume: (� Casing Diameter: 2' 4" 6" <br /> Gal./Ft.: 0.16 0.65 3.47 <br /> Sampler(s):M.Rauser Sample Containers:VOA's <br />' Sample 1.D.: MW-q/2-24-99 Analysis: TP - <br /> y H g; BTEX;MTBE; 8260 <br /> Stabilization Data <br />' <br /> Time Volume Cond Color/ <br /> (gallons) pH Temp. ys/cm Turbidity Notes <br /> X <br /> 7, Z- �z <br /> . , . <br /> r .1110. <br /> IPurge Method: 2 Stage Purge Pump <br /> Sample Method: Disposable Bailer Well Integrity: <br /> Sample Time: l Dissolved OZ: L7. [ v — 1 7 3 o-L <br /> i <br /> IC Hydac I Hydac2 WA ' (V VI 1,7'1 /r,� LOX <br /> vn.ia.3.o"9MEM <br /> I <br />