Laserfiche WebLink
PLAN REVIEW AND ARATING PERMIT FEES <br />a. New facility plan review fee of $712.00 (8 hour minimum per facility), $500.00 facility fee <br />(includes one tank), $125.00 per tank after the first tank, plus $8.00 state surcharge fee per tank is <br />due at time of plan submittal plus $10.00 per site state surcharge. <br />b. New installation of an additional tank at an existing facility is $712.00 plan review fee (8 hour <br />minimum per facility) plus $500.00 facility (includes one tank), $125 per new tank after first <br />tank, and $8.00 per new tank state surcharge fee. <br />C. It should be noted that a $712.00 plan review check fee required for each submittal allows for up <br />to eight (8) hours of staff review and/or inspection time. Additional time spent on plan review, <br />meetings, inspections, phone or office consultations will be billed to the applicant at a rate of <br />$89.00 per hour. <br />d. The maximum review time for UST installation plans is 40 working days. A preliminary review <br />will be conducted by the PHS-EHD within 20 working days of submittal date to identify any <br />gross plan deficiencies. <br />e. If gross deficiencies are identified, the plans will be returned with a checklist identifying plan <br />deficiencies. <br />To expedite the review of installation plans, time and a half per hour overtime fee may be <br />submitted to have review completed within 10 working days of submittal date if staff is available <br />to perform the review. <br />3. PLAN REVIEW GUIDELINES <br />a. The enclosed plan review sheet is to be completed and submitted with the three sets of drawings <br />to PHS-EHD. <br />b. A copy of the California UST Regulations may be obtained from the California State Water <br />Resources Control Board at (916) 227-4303. <br />C. Permits and/or plan check approval may also be required by the San Joaquin Valley Unified Air <br />Pollution Control District, the County/City Building Department and the Fire District in your <br />respective area. <br />d. A minimum of 3 inspections will be conducted on the UST system installation. A $89 per hour <br />inspection fee shall be charged for additional inspections or reinspection as required. (See <br />required inspections below) <br />e. Applicant/contractor to adhere to the approval plan and any change or deviation shall be reported <br />to and approved by PHS-EHD prior to installation. <br />The application for installation of underground tanks is only valid for the calendar year in which <br />it has been issued. A permit may be extended into the next calendar year if a letter is sent to <br />PHS-EHD requesting this extension thirty days prior to the end of the calendar year. A one time, <br />one year extension may be granted by PHS-EHD upon receipt of this letter. <br />