My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1989 - 2002
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
25775
>
2300 - Underground Storage Tank Program
>
PR0231708
>
COMPLIANCE INFO 1989 - 2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2019 1:12:34 PM
Creation date
2/8/2019 9:46:02 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1989 - 2002
RECORD_ID
PR0231708
PE
2361
FACILITY_ID
FA0003619
FACILITY_NAME
ARP MINI MART CORP
STREET_NUMBER
25775
Direction
S
STREET_NAME
PATTERSON PASS
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
20910004
CURRENT_STATUS
01
SITE_LOCATION
25775 S PATTERSON PASS RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
210
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
pipe. Matching tapers in bell and Resistant to sunlight in the outer piping have the same <br /> spigot make a firm interference fit to In the final step of the unique excellent chemical resistance as <br /> hold the joint together while the Dualoy 3000/L pipe manufacturing the carrier line. <br /> -` adhesive cures. Ameron's UL- process, a uniform resin-rich exterior Dualoy 3000/L containment systems <br /> listed adhesive cures at normal coating is added to protect the resin- are easy to install. Dualoy 3000/L <br /> temperatures without heating glass bond of the structural wall pipe is so smooth on the outside <br /> ' blankets or outside heat sources. from UV radiation. As a result, <br /> that the contractor need only <br /> And for cold weather installations, Dualoy 3000/L can be stored out of remove the surface gloss before <br /> the necessary accessories are doors without special precautions installing the containment fittings: <br /> readily available from Ameron. before installation. no special end preparation is <br /> Unlike competitive fiberglass and Secondary containment required. Only Ameron can offer <br /> steel piping, Dualoy 3000/L has no systems such simple installation. <br /> threads to cross or strip. A slight Ameron secondary containment Sales and technical <br /> twist as the spigot is inserted into the systems use rigid, heavy wall outer <br /> bell and the joint is complete. The y g y assistance <br /> joint can usually be made by a fittings with the next larger size Our engineering department <br /> Dualoy 3000/L pipe to totally provides technical assistance to <br /> enclose the UL-listed carrier pipe owners and contractors in <br /> from turbine to dispenser. These specifying, designing and installing <br /> systems provide a continuous underground fuel-handling systems. <br /> space between secondary and Dualoy 3000/L piping is available <br /> primary which makes it possible to in the United States and Canada <br /> test the integrity of the containment through the most extensive stocking <br />,ion me at any time. distributor and sales representative <br /> All pipe and fittings in a Dualoy 3000/L network of any fiberglass pipe <br /> containment system are manufactured manufacturer. Contact Ameron <br /> from fiberglass reinforced epoxy Fiberglass Pipe Division, Houston, <br /> resins. As a result, all components Texas for further information. <br /> The quick adhesive joint is one reason a two- <br /> man crew can put in more Dualoy 30001E in <br /> 3 days than a three-man steel crew in 4 days. <br /> single worker. Compare this to the <br /> effort needed to screw steel pipe <br /> together, where it frequently takes <br /> two workers to join even 2-inch <br />§ pipe—to say nothing of larger <br /> sizes. An important point since *RV <br /> 1 out of 7 steel pipe joint leaks can < <br /> be attributed to loose fittings. "~ <br /> Full range of UL-listed sizes <br /> 7 >4 Dualoy 3000/L is the only line of <br /> fiberglass pipe, fittings and adapters <br /> available in a full 2-through 6-inch >h ti <br /> size range with Underwriters' <br /> Laboratories listing. Ameron thus <br /> s ,�3 offers UL-listed components not only <br /> for typical small-diameter service <br /> station installations, but also for <br /> w <br /> � me large-volume facilities such as bulk -A�-•-�-�-�i�•- •#�-- �� --N- " +s��=�� -- <br /> we fuel terminals, marinas and central Ameron secondary containment systems employ rigid,heavy wall epoxy fittings with Dua/oy30001L <br /> can.bpipe to contain the carrier piping.Seen here during a service station rehabilitation are three contained <br /> fuel oil systems. product lines for regular,unleaded and super unleaded gasoline and one single wall vent fine <br />
The URL can be used to link to this page
Your browser does not support the video tag.