Laserfiche WebLink
SWRCB,January 2002 Page to of.. <br /> 7. UNDER-DISPENSER CONTAINMENT UDC)TESTING <br /> Test Method Developed By: U UDC Manufacturer LO Industry Standard E Professional Engineer <br /> E Other(Specify) <br /> Test Method Used: E Pressure Vacuum J2 Hydrostatic <br /> E Other(Spec) <br /> TeaEquipineatUwd., AiS /LiAl. p4zx,e (,.,4 —rz>,,t A4fi:7—(eyz_ 'I Equiprnerit Resolution: <br /> - <br /> UDC# 7UR# <br /> 1 UDC# UDC <br /> UDC Manufacturer: <br /> UDC Material: F1 - LA S5; 1 F-1is eKL t-a 5�jj F,A,. <br /> UDC Depth: <br /> Height from UDC Bottom to Top <br /> of Highest Piping Penetration: Cl <br /> Height from UDC Bottom to <br /> Lowest Electrical Penetration; <br /> Condition of UDC prior to <br /> testing: 0 a C>,.> <br /> Portion of UDC Tested' 17 )2 <br /> Does turbine shut down when C Yes F No El NA <br /> UDC sensor detects either A Yes Ll No 0 NA iYes Ll No 0 NA VYes L No L NA <br /> product or water? <br /> Turbine shutdown response time <br /> Is system programmed for fail- Z Yes 0 No ONA� <br /> safe shutdown?' ii Yes L❑ <br /> I]No, DNA @Yes 0 No 11 NA ®Yes 11 No E NA <br /> , <br /> Was fail-safe verified to be C1 Yes 0 No 0 NA " <br /> erationalf I <br /> [!yes,--Il&o C]NA 11 Yes ®No DNA EYes ONo UNA <br /> op <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test MIA.) <br /> Test Start Time: 7 "tiO <br /> Initial Reading(R,): v ix, <br /> Test End Time: S- 17/6_5' V 0 <br /> Final Reading(Rr): <br /> Test Duration: j 2 Al 1,0, 12 MIA) 12- /A- ) A) <br /> Chanae in Reading(RF-ki): 0. 0, ._,v.:,+. <br /> It 0. <br /> �qtRes <br /> Pass/Fail Threshold or-4�ritenia; V02� 0,002- <br /> ' OF a pass. i;i7- 4pa$s OFAI <br /> Was sensor removed for testing? -41 Yes D No 0 NA 11 Yes 0 No D NA *Yes ONo ONA Yes 0 No 0 NA <br /> Was sensor properly replaced and P Yes,, 0 No 0 NA I Yes El No 11 12 NA Yes 0 No 11 NA z Yes 11 No 0 NA <br /> verified functional after testing? 0 .","I — I I <br /> Comments— (include information on repairs made prior to testing, and recommended Lollow-upforfailed tests) - <br /> 1 if the testing method does not test the entire depth of the UDC,specify how much of the UDC was tested, Methods not testing the <br /> entire UDC should only be used if the monitoring system provides fail-safe turbine shutdown. (See SWRCBLG-160) <br /> 2 With the submersible pump running,place the sensor in product(discriminating sensors should also be placed in water). The time <br /> between placing the sensor in product and the turbine shutting down is the response time. This should be done if the secondary <br /> containment testing method used does not test the entire volume of the UDC <br /> This information is not needed if the entire UDC is tested. <br />