My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1989 - 2002
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
25775
>
2300 - Underground Storage Tank Program
>
PR0231708
>
COMPLIANCE INFO 1989 - 2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2019 1:12:34 PM
Creation date
2/8/2019 9:46:02 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1989 - 2002
RECORD_ID
PR0231708
PE
2361
FACILITY_ID
FA0003619
FACILITY_NAME
ARP MINI MART CORP
STREET_NUMBER
25775
Direction
S
STREET_NAME
PATTERSON PASS
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
20910004
CURRENT_STATUS
01
SITE_LOCATION
25775 S PATTERSON PASS RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
210
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MONITORING SYSTEM CERTIFICATION <br /> For Use By All Jurisdictions Within the State of California <br /> Authority Cited.- Chapter 6.7, Health and Safety Code; Chapter 16,Division 3, Title 23, California Code of Regulations <br /> This form must be used to document testing and servicing of monitoring equipment. A separate certification or report must be orepared <br /> for each monitoring system control panel by the technician who performs the work. A copy of this form must be provided to the tank <br /> system owner/operator. The owner/operator must submit a copy of this form to the local agency regulating UST systems within 30 <br /> days of test date. <br /> A. General Information <br /> Facility Name: O Bldg.No.: <br /> Site Address: `7 �� City: C-/ Zip: <br /> Facility Contact Person: q Contact Phone No.: ( ) <br /> Make/Model of Monitoring System: e'(',*. j�n�-TI 5 Date of Testing/Servicing: -S / �rl <br /> B. Inventory of Equipment Tested/Certified <br /> Check the appropriate boxes to indicatespecific a ui ment inspected/serviced: <br /> Tank ID: Tank ID: 7 <br /> In-Tank Gauging Probe. Model: 77 In-Tank Gauging Probe. Model: V 7 <br /> Annular Space or Vault Sensor. Model:, 94 icf -4/05' Annular Space or Vault Sensor. Model: —7P/3i0 Q5f <br /> Piping Sump/Trench Sensor(s). Model:-X`f 3bU 1--e-S Piping Sump/Trench Sensor{s). Model:7<L/ ��;t• '�� <br /> Fill Sump Sensor(s). Model: ze-' Fill Sump Sensor(s). Model:',�i'`�35�� yrs <br /> b Mechanical Line Leak Detector. Model: b Mechanical Line Leak Detector. Model: <br /> Electronic Line Leak Detector. Model: e- E' I ❑ Electronic Line Leak Detector. Model: <br /> Tank Overfill/High-Level Sensor. Model: Cl Tank Overfill/High-Level Sensor. Model: <br /> ❑ Other(specify equipment tv a and model in Section E on Pate 2). ❑ Other(specify equipment tv a and model in Section E on Paee 2). <br /> Tank ID: Si_i Tank ID: <br /> In-Tank Gauging Probe. Model: In-Tank Gauging Probe. Model: Y q7 5 <br /> Annular Space or Vault Sensor. Model: ' - I]� Annular Space or Vault Sensor. Model: <br /> Piping Sump I Trench Sensor(s). Model: —740 tint _'t`J Piping Sump/Trench Sensor(s). Model: <br /> Fill Sump Sensor(s). Model-.-7 q4 %"I c'J Fill Sump Sensor(s). Model: n,4 j-R�, ,?z:E- <br /> ❑ Mechanical Line Leak Detector. Model: ❑,Mechanical Line Leak Detector. Model: <br /> ❑ Electronic Line Leak Detector. Model: Electronic Line Leak Detector. Model: C'0 1 <br /> ❑ Tank Overfill/High-Level Sensor. Model: �Tank Overfill/High-Level Sensor. Model: <br /> ❑ Other(s ecifv equipment tv a and model in Section E on Page 2). ❑ Other(specify a ui ment ty2e and model in Section E on Page 2). <br /> Dispenser ID: f� ^` Dispenser ID: 3`ly <br /> fel Dispenser Con Lai nment Sensor(s). Model: G`f es zz Dispenser Containment Sensor(s). Model: i f`/-5 ae, 'Shear Valve(s).Valve(s). Shear Valve(s). <br /> Dispenser Containment Float(s)and Chain(s). ❑ Dispenser Containment Float(s)and Chain(s). <br /> ispenser ID: �)— Dispenser ID: <- <br /> Dispenser Containment Sensor(s). Model: f 7T� ='cf Dispenser Containment Sensor(s). Model: <br /> hspenser <br /> ear Valve(s). Shear Valve(s). <br /> Containment Float(s)and Chain(s). ❑ Dispenser Containment Floats)and Chain(s). <br /> Dispenser ID: Dispenser ID: <br /> ❑ Dispenser Containment Sensor(s). Model: ❑ Dispenser Containment Sensor(s). Model: <br /> ❑ Shear Valve(s). ❑ Shear Valve(s). <br /> ❑Dis enser Containment Floats)and Chain(s). ❑ Dispenser Containment Floats)and Chain(s). <br /> *If the facility contains more tanks or dispensers,copy this form. Include information for every tank and dispenser at the facility. <br /> C. Certification .I certify that the equipment identified in this document was inspected/serviced in accordance with the manufacturers' <br /> guidelines. Attached to this Certification is information (e.g. manufacturers' checklists) necessary to verify that this information is <br /> correct and a Plot Plan showing the layout of monitoring eq ipment. For any equipment capable of generating such reports,1 have also <br /> attached a copy of the report;(check all that apply): System set-up Alarm history report <br /> Technician Name(print): John COUrant Signature: <br /> Certification No.: C/.F- — 0 -- 6)5,5 4�f- License.No.: 1 R44Rf) _ <br /> Testing Company Name: Scott Co of Cal i forni 3 Phone No.:1;—gig RqS—�RRR Y JR5 <br /> Site Address: Date of Testing/Servicing: <br /> Page 1 of 3 03/01 <br /> Monitoring System Certification <br />
The URL can be used to link to this page
Your browser does not support the video tag.