My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BIRD
>
37400
>
2900 - Site Mitigation Program
>
PR0527767
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2019 11:02:27 AM
Creation date
2/8/2019 10:54:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0527767
PE
2950
FACILITY_ID
FA0018823
FACILITY_NAME
GRANITE CONSTRUCTION CO
STREET_NUMBER
37400
Direction
S
STREET_NAME
BIRD
STREET_TYPE
RD
City
TRACY
Zip
95304
APN
26512006
CURRENT_STATUS
01
SITE_LOCATION
37400 S BIRD RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAR - 3 2008 <br /> January 24, 2008 ENV!RONNILi 11 HEALTH CMis M U�■ n <br /> h <br /> PERRI!TFRtr!Cre C7� <br /> Deborah A. Greenleaf, Esq. 1923 <br /> Shell Oil Products US <br /> Environmental Claims <br /> One Shell Plaza <br /> 910 Louisiana, Rm 667 <br /> Houston,TX 77002 <br /> Reference: Granite Construction Company, Vernalis Site, California <br /> Dear Ms. Greenleaf, <br /> Granite Construction Company has received Shell Pipeline's Workplan for Soil <br /> Screening Assessment, dated January 23, 2008. Granite Construction Company hereby <br /> gives Shell Pipeline permission to start immediately collecting soil samples at the <br /> Vemalis Site according to the soil sample location map provided by RAM, dated January <br /> 2008 (23 locations). We do not, however, agree to the stated objective of limiting <br /> analytical results to concentrations greater than 500ppm. All samples should be tested for <br /> TPFI as crude and all concentrations reported,regardless of concentration. <br /> Please be advised that construction of an Aggregate Processing facility at the Vernalis <br /> Site is planned to start Monday, February 4, 2008. After construction activity has <br /> commenced, the area-of-focus will encounter an additional three feet (3 ft.) of fill <br /> material, as part of a site-grading plan. Following the completion of the site grading, <br /> work will commence with the installation of an electrical substation in the general facility <br /> of the spill area. This work will include Substation foundation construction, Substation <br /> Equipment installation, underground trenching and power pole installations, Access to <br /> the spill area for testing and remediation work will be limited during construction <br /> activities. You are strongly encouraged to accelerate your schedule to complete your <br /> work in this area before February 4, 2008. <br /> We look forward to your cooperation on this matter. Please contact me at (209) 234-3555 <br /> with any questions. <br /> Sincerely` <br /> Syd DeVries, <br /> Plants Manager <br /> Cc: Brian Hoffman Stock�B arch <br /> Geoff Boraston Box +5: <br /> Hop Essick s:x.o ,CA 95261 <br /> 1,909`989-47so <br /> -A,4'209, 983 <br />
The URL can be used to link to this page
Your browser does not support the video tag.