Laserfiche WebLink
Central Valley Regional Water Quality Control Board 6793.4.001.01 <br /> North Lathrop Properties May 20, 2005 <br /> WORK PLAN FOR GROUNDWATER STUDIES Page 3 <br /> Laboratory Testine <br /> Selected soil samples from our exploratory locations may be tested in our laboratory to <br /> determine moisture contents, density, sieve analysis, and hydrometer testing for this project. <br /> Additional soil samples may be collected for chemical analysis. These 2-inch by 6-inch brass <br /> tubes will be sealed using Teflon sheets secured by tight-fitting plastic caps. The soil samples <br /> will be labeled to indicate a unique sample number,time and date collected, sample location, and <br /> sampler's identification. Samples will be preserved in a chilled cooler during transportation to <br /> Severn Trent Laboratories, Inc. (STL) in Pleasanton, California with a completed chain-of custody <br /> document for analysis. <br /> Survevine <br /> The services of a licensed land surveyor will be retained to establish horizontal coordinates and <br /> elevation data for each of the five wells. Elevation data provided by the surveyor will include <br /> elevations for the top of well casing, the top of the concrete monument for the well, and the ground <br /> surface at the well. We will request the surveyor tie the survey of the wells to the nearest <br /> documented benchmark to establish elevation control. <br /> Water Level Data Collection <br /> Following well development, each shallow monitoring well will be equipped with a pressure <br /> transducer that will allow for automated data collection and efficient data retrieval. We propose <br /> to download information from the data loggers onto a laptop computer once per month, for a period <br /> of three months following well construction to assure the data loggers are operating properly. We <br /> will then download data from the loggers once per quarter for three additional quarters. The water <br /> level data will be translated into an electronic spreadsheet format and the data for each well will be <br /> plotted versus time to illustrate changes in water levels over time. We will summarize the <br /> groundwater data quarterly using a cumulative format. <br /> Quarterly Water Quality SamnlinQ <br /> We propose to sample the water wells on a quarterly basis starting the first quarter after the wells <br /> have been developed. The following sampling protocol will be used to collect the water samples: <br /> • The groundwater depth in the monitoring well will be measured to calculate the number of well <br /> volumes required for purging. <br /> • The wells will be purged using a 12-volt pump while monitoring stabilization of groundwater <br /> parameters (temperature, pH and electrical conductivity). The pump will be decontaminated <br /> between each well sampling. <br />