My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BRANDT
>
12101
>
3500 - Local Oversight Program
>
PR0544120
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2019 1:40:49 PM
Creation date
2/8/2019 1:35:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544120
PE
3528
FACILITY_ID
FA0004407
FACILITY_NAME
STAR BUILDING SYSTEMS
STREET_NUMBER
12101
Direction
E
STREET_NAME
BRANDT
STREET_TYPE
RD
City
LOCKEFORD
Zip
95237
APN
05132007
CURRENT_STATUS
02
SITE_LOCATION
12101 E BRANDT RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ceco Buildings Division <br /> The Coco Corporation PHONE (209) 727-5504 <br /> 12101 EAST BRANDT ROAD,LOCKEFORD,CALIFORNIA 95237 <br /> (209) 727-5820 <br /> VI <br /> MAY <br /> Er%(VIRO IVIESVTAL <br /> PERM May 15., 1991 ERVICEs <br /> San Joaquin County- Public Health Service - <br /> Environmental Health Division <br /> E P.O. Box 2009 <br /> Stockton, CA 95201 <br /> 'Attention-: Ms. .-Mary. Meays- <br /> Re: Workplan For Closure <br /> Underground Tank Site #2363 <br /> E <br /> Dear. Ms.- Meays: <br /> Ceco Building. Systems in order to close this tank site and <br /> bring.--this matter to a conclusion., proposes to do the fol- <br /> lowing work: <br /> 1. Remove the small pile of soil , estimated at 5 <br /> cubic yards, - to a state approved landfill using <br /> a state approved con'tractor- to transport the <br /> material. This work includes profiling and sta- <br /> bilizing the .material as 'may be- required. OR <br /> Bioremediate the small pile, of soil according to ' <br /> procedures proscribed. by SCS Engineers of Dublin, <br /> California. Upon-� successful bioremediation , the <br /> soil would be returned -to the original hole. <br /> 2 . Return the large_ pile of soii, estimated at 40 <br /> to 50 cubic yards,�toJthe hole Ifrom'whzch it <br /> originated. <br /> 3. Complete filling the hole from, which the tanks <br /> were removed using excess soil available on Ceco' s <br /> premises.. This excess, soi.l' was generated at the <br /> time the -moat surrounding our property was formed. <br /> Ceco Building Systems plans to use Thorpe .Oil Company of <br /> Lodi , California to handle all soil movement on our premises. <br /> Thorpe is the contractor who' originally .removed the tanks at <br /> this site and exhibited a high degree of': professional com- <br /> petence in that. work.- <br />
The URL can be used to link to this page
Your browser does not support the video tag.