Laserfiche WebLink
AEI Project No. 306556 <br /> April 6, 2012 <br /> Page 4 of 4 <br /> VI Estimated Schedule and Reporting <br /> Completion of this work is contingent upon approval of this work plan, receipt of approved <br /> drilling permits, and pending subcontractor availability. Laboratory analytical results will be <br /> obtained within approximately one week following the sample collection. A final report will be <br /> prepared following the receipt of analytical data. A final report will be prepared and submitted <br /> to the client and the SJCEHD following the receipt of analytical data. <br /> If there are any questions regarding our investigation, please do not hesitate to contact AEI at <br /> (925) 746-6000. <br /> Sincerely, <br /> AEI Co ultants <br /> Adrian Angel, Bryan Campbell, PG <br /> Project Geo gist Program Manager <br /> Figures <br /> Figure 1: Site Location Map <br /> Figure 2: Vicinity Map <br /> Figure 3: Tentative Boring Location Plan <br /> Appendices <br /> Appendix A: Health & Safety, Injury &Illness Prevention Plan <br />