Laserfiche WebLink
• Date July 31, 2002 <br /> ARCO QUARTERLY GROUNDWATER MONITORING REPORT <br /> Facility No 6080 Address 85 Louise Avenue, Lathrop, California <br /> ARCO Environmental Engineer Paul Supple <br /> Consulting Co/Contact Person URS Group, Inc 1 Mr Vern Elarth <br /> Consultant Project No 06080-01-4 <br /> Primary Agency/Regulatory ID No Lori Duncan, San Joaquin County Public Health Services <br /> WORK PERFORMED THIS QUARTER (Second 2002) <br /> 1 Groundwater samples were collected from monitoring wells MW-1 through MW-3 and submitted for <br /> laboratory analysis <br /> 2 Groundwater monitoring data was compiled and evaluated <br /> WORK PROPOSED FOR NEXT QUARTER (Third 2002) <br /> 1 Quarterly groundwater monitoring will continue at the site The next sampling event is tentatively <br /> scheduled for September 2002 Groundwater monitoring wells MW-1 through MW-3 will be purged, <br /> and samples will be collected and analyzed for total petroleum hydrocarbons as gasoline (TPHG), <br /> benzene, toluene, ethylbenzene, and total xylenes (BTEX) using U S Environmental Protection <br /> Agency (USEPA) Method 8015/8020 DHS LOFT, and for methyl tertiary butyl ether (MTBE), tertiary <br /> butyl alcohol (TBA), di-isopropyl ether (RIPE), ethyl tertiary butyl ether (ETBE), tertiary amyl methyl <br /> ether (TAME), and 1,2-dichloroethane (1,2-DCA) using USEPA Method 8260 <br /> Current Phase of Project Monitoring <br /> Frequency of Groundwater Sampling All Monitoring Wells= Quarterly <br /> Frequency of Groundwater Monitoring Quarterly <br /> Sampling Date June 20, 2002 <br /> Is Free Product(FP) Present on Site No <br /> FP Recovered This Quarter NIA <br /> Cumulative FP Recovered to Date NIA <br /> Approximate Depth to Groundwater 9 00 to 9 80 feet bgs <br /> Groundwater Flow Direction East <br /> Groundwater Gradient 0 0011 ft/ft <br /> P 1Bp-Arco for URS160801Quarterly\Arco_6080_2Q02 doe <br />