My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0004935
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
85
>
3500 - Local Oversight Program
>
PR0544124
>
ARCHIVED REPORTS XR0004935
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2019 3:19:30 PM
Creation date
2/8/2019 3:12:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0004935
RECORD_ID
PR0544124
PE
3500
FACILITY_ID
FA0012144
FACILITY_NAME
ARCO STATION #6080
STREET_NUMBER
85
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330
APN
19627010
CURRENT_STATUS
02
SITE_LOCATION
85 LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br /> +� Date February 1, 2001 <br /> ARCO QUARTERLY GROUNDWATER MONITORING REPORT <br /> Facility No 6080 Address 85 Louise Avenue, Lathrop, California <br /> ARCO Environmental Engineer Paul Supple <br /> Consulting Co/Contact Person Delta Environmental Consultants, Inc /Jay R Johnson <br /> Consultant Project No D000-339-2 <br /> Primary Agency/Regulatory ID No Lori Duncan, San Joaquin County Public Health Services <br /> WORK PERFORMED THIS QUARTER (Fourth 2000) <br /> 1 Groundwater samples were collected from monitoring wells MW-1 through MW-3 and submitted for <br /> laboratory analysis <br /> 2 Delta compiled and evaluated groundwater monitoring data <br /> WORK PROPOSED FOR NEXT QUARTER (First 2001) <br /> . 1 Delta will continue to perform routine quarterly groundwater monitoring on behalf of ARCO The next <br /> sampling event is tentatively scheduled for March 2001 Groundwater monitoring wells MW-1 through <br /> MW-3 will be purged and samples collected and analyzed for total petroleum hydrocarbons as <br /> gasoline (TPHG) using U S Environmental Protection Agency (USEPA) Method 8015 DHS LUFT and <br /> for benzene, toluene, ethylbenzene, and total xylenes (BTEX), methyl tertiary butyl ether (MTBE), <br /> tertiary butyl alcohol (TBA), di-isopropyl ether (DIPE), ethyl tertiary butyl ether (ETRE), tertiary amyl <br /> methyl ether (TAME) and 1,2-Dichloroethane (1,2-DCA) using USEPA Method 8260 <br /> Current Phase of Project Monitoring <br /> Frequency of Groundwater Sampling All Monitoring Wells =Quarterly <br /> Frequency of Groundwater Monitoring Quarter] <br /> Sampling Date December 11, 2000 <br /> Is Free Product (FP) Present on Site No <br /> FP Recovered This Quarter N/A <br /> Cumulative FP Recovered to Date N/A <br /> Approximate Depth to Groundwater 9 14 to 9 97 feet bgs <br /> Groundwater Flow Direction North-East <br /> Groundwater Gradient 0 0005 ft/ft <br /> i <br /> C\ARC0160801QTRL'Y\200016080Q300 Delta <br /> 2/1/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.