Laserfiche WebLink
BROWN AND <br /> C A L D W E L L <br /> ii <br /> APR 191995 <br /> April 17, 1995 <br /> ENVIRONMENTAL HEALTH <br /> PERMIT/SERVICES <br /> Mr. Kyle Christie <br /> ARCO Products Company <br /> 2155 South Bascom Avenue, Suite 202 <br /> Campbell, California 95008 017-2052-0111 <br /> Subject: First 1995 Quarter Status Report for ARCO Facility 6080, <br /> Lathrop, California <br /> Dear Mr. Christie: <br /> This letter presents activities performed during the first quarter of 1995 at ARCO Products <br /> Company (ARCO) Facility 6080, located at 85 East Louise Road in Lathrop, California. <br /> There are three on-site groundwater monitoring wells (AL-1, AL-2, and AL-4) at facility 6080. <br /> 4 <br /> Groundwater at this site is sampled annually. The annual sampling for 1995 is scheduled to <br /> be performed in the third quarter of 1995, in August. The results of the sampling will be <br /> reported to the California Regional Water Quality Control Board. This report was prepared <br /> 4 under Task Order 6080-95-5. <br /> SUMMARY OF WORK <br /> Work Completed in First Quarter 1995: <br /> • Submitted fourth quarter 1994 status report. <br /> Work Completed in Second Quarter 1995: <br /> f Submit first quarter 1995 status report. <br /> This report was prepared in accordance with the standards of the environmental consulting industry at the time it was <br /> prepared. It should not be relied upon by parties other than those for whom it was prepared, and then only to the <br /> extent of the scope of work which was authorized. This report does not guarantee that no additional environmental <br /> contamination beyond that described in this report exists at the site. <br /> Environmental Engineering And Consulting•Analytical Services <br /> 205z\REP0RT5\1 ST95QTR.RPr <br /> 9616 MICRON AVENUE, P. O. Box 13449, SACRAMENTO, CA 95813-3449 <br /> (916) 444.0123 FAX (916) 856.5277 <br /> E <br />