ARCO Meeting Minutes <br /> August 8, 1994 <br /> Page 5 <br /> ARCO stated that installation and operation of a vapor extraction system <br /> abatement unit is available. ARCO sl begin once an <br /> aid that they intend to utilize trnext alvailable unit for <br /> remediation of ARCO SS No. 760 which appears to have a higher degree of hydrocarbon impact. <br /> Mary disagreed and requested ARCO to evaluate the two sites by calculating a mass balance 9 <br /> and make a determination based on the total amount of hydrocarbons in the soil. ARCO said <br /> they would provide this information of her in the near future. <br /> ARCO 2133, StocktonMa <br /> { ry M says) f <br /> ,a <br /> Mary indicate that installation of the soil remediation system has been delayed too long. She <br /> states that the extent of the groundwater and soil contamination to the south and west of the site <br /> has not been defined. She stated that her request for the remedial system <br /> was to be <br /> July 20, 1994. Kyle explained that the owner of the site is a new franchisee and if ARCO instailed by <br /> environmental closed the station down for two weeks that would be required to install the system, <br /> peak season for sales. Therefore, the system construction will commence h <br /> ec <br /> then this new owner would loose a significant portion of his annual rev e ause this is his <br /> week after Labor <br /> Day. The County agreed with this. Chuck explained that all permits are in pl <br /> for building the system has been awarded. ace and the contract <br /> I <br /> ARCO would like to state that they have been very diligent with design and implementation of the <br /> vapor and sparge remedial system. There are many elements to securing information that f <br /> ultimately have major influence and factors for this kind of remedial approach. We would like to ! <br /> add that we are much further along then other responsible parties in the area. <br /> s <br /> Mary says that ARCO has not been diligent as she would like in obtaining permission to drill in <br /> Cal-Trans right of way between the ARCO site and the 1-5 off ramp. Steve Misner explained that <br /> BC requested a letter of refusal on a number of times from Mr. Galliano of Cal-Trans but they <br /> have not submitted one. Mary says we should write at least one more letter to Cal-Trans <br /> requesting permission. Chuck says a letter will be prepared. Diane Hinson states that it may be <br /> possible to drill a couple of hydropunch samples in this area, so that we will be out in the right of a <br /> way one time. Diane will give Steve Misner the name of the contact she has at Cal-trans. t <br /> Group discussed problems obtaining off site access to the condominiums to the south of the site_ a <br /> Misner states that BC has tried to reach the owner of the parking area with no success. Kyle <br /> states that BC will write a letter to this person by the end of August. <br /> Mary says she is going to require samples from below the groundwater table during the next <br /> phase of drilling. She says the data can be used to calculate the mass balance of h rc <br /> in the soil. There was discussion concerning the use of this data and whether or not thisdarta data <br /> � <br /> would really be accurate or even be detected. ARCO will agree to collect a few selected samples <br /> to show a good faith effort to further analyze whether or not this additional expense is <br /> appropriate. <br /> Mary stated that during the initial release at this site the hydrocarbon vapors blew the city street <br /> lights out. <br /> ARCO 6080, Lathrop (Linda Turkatte) <br /> Annual sampling should be conducted at this site. The sampling has been scheduled in August. <br /> Linda suggest that the County split a sample with GTI when they are out there sampling in <br /> August and ARCO agrees. <br /> l <br /> 1 <br />