My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
85
>
3500 - Local Oversight Program
>
PR0544124
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2019 3:36:52 PM
Creation date
2/8/2019 3:17:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544124
PE
3500
FACILITY_ID
FA0012144
FACILITY_NAME
ARCO STATION #6080
STREET_NUMBER
85
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330
APN
19627010
CURRENT_STATUS
02
SITE_LOCATION
85 LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�A "A <br /> San Joaquin/ARCO Meeting Minutes, March 30, 1993 Working To Restore Nature <br /> E. Closure <br /> 1. definition: SJC indicated that they require destruction of all monitoring <br /> wells and completion of remediation (including removal of remedial <br /> equipment) before granting closure; therefore, closure will not be <br /> granted on sites undergoing post-remedial monitoring; this will affect <br /> sites considered for closure on basis of RA/FT studies. <br /> 2. monitoring: no discussion <br /> 3. hydrologic cycle: no discussion <br /> 4. Basin Plan amendments: Beth Thayer stated that she is not aware of <br /> the status of the basin plan amendments; she also stated again that <br /> federal and state involvement in the military base closures will have <br /> II . ARCO Sites (Environmental Consultant; RESNA Industries) <br /> SS No. 2130, North El Dorado St. Stockton <br /> o Min k Infurna stated that he had just recently re rved the ground-water <br /> monitor' data for the fourth quarter 1992. H ould like these reports to <br /> be submitt at least before the sampling d of the following quarter. <br /> o RESNA informe SJ that the res s of the first quarter ground-water <br /> sampling event have en receive and the quarterly monitoring report will <br /> be submitted in Apn . R NA presented the ground-water results <br /> summarized on a plate. <br /> o Mike stated that the gr nd wa in the two upgradient wells (MW-1 and <br /> MW-4) has consistent reported mo rate to high levels of hydrocarbons. He <br /> asked when ARC intended to ess ground water upgradient and <br /> crossgradient fro these wells (i.e. acro Hammer Lane and in the mall <br /> parking area). ESNA stated that access drill in Hammer Lane would <br /> likely not be ranted by Caltrans. SJ asked th an attempt should be made. <br /> o Mike in ired about the results of the air spar pilot test which was <br /> conduc d in December 1992. RESNA informed that the data are <br /> curre y being evaluated and a final report would be bmitted in April. <br /> Prel' inary evaluation indicates that air sparging may be a asible method <br /> of mediation. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.