Laserfiche WebLink
� I <br /> i, <br /> ATC Associates SITE SAFETY PLAN <br /> ii <br /> On-site communications: ❑ Radio 21 Verbal 0 Hand Signals <br /> i <br /> ❑ Other <br /> 'i <br /> Designate hand signals here: �# <br /> �i <br /> Off-site communications: ❑ Radio D Telephone <br /> k <br /> ❑ Other <br /> The specific signal for an emergency is: Verbally Given k <br /> The specific signal for'an evacuation is: Verbally Given <br /> Evacuation assembly point is: To be determined on-site prior to begin'ninwork activities. <br /> �I <br /> MARK EVACUATION ROUTE(S) ON SITE MAP L7 CHECK WHEN DONE <br /> I <br /> SANITATION AND DECONTAMINATION <br /> Personnel Decontamination Procedure: All contaminate personal protective equipment [ <br /> i.e. <br /> y gloves, coveralls) will Ibe placed in 55-gallon drums <br />+ and stored onsite with drill cuttings. <br /> Location of Wash Water: Restroom on-site <br /> I <br /> j� <br /> Location of Toilet: Restroom on-site j <br /> II <br /> Location of Drinking Water: ATC truck <br /> MARK LOCATION OF EYEWASH AND SHOWER DRENCH ON SITE MAP L7 CHECK WHEN } <br /> DONE <br /> i Equipment Decontamination Procedure: Equipment will be washed with a trisodium <br /> iphosphate solution and/or steamcleaned. <br /> Materials to be Disposed of as Hazardous Waste: All soil and water produced during drilling <br /> IF <br /> activities will be stored on-site until disposal <br /> methods are determined. <br /> I! <br /> PAGE 11 ' <br /> �1 . <br />