My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BROADWAY
>
1011
>
2900 - Site Mitigation Program
>
PR0539578
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2019 4:31:36 PM
Creation date
2/8/2019 4:26:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0539578
PE
2960
FACILITY_ID
FA0022650
FACILITY_NAME
SPINGOLO TRUCKING
STREET_NUMBER
1011
Direction
N
STREET_NAME
BROADWAY
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
14324013
CURRENT_STATUS
01
SITE_LOCATION
1011 N BROADWAY AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r - <br /> Additional Site Assessment Work Plan <br /> SPINGOLO TRUCKING COMPANY <br /> 1011 North Broadway Avenue, Stockton, California <br /> TABLE OF CONTENTS <br /> SECTION PAGE <br /> 1.0. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 <br /> 2.0. BACKGROUND . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 <br /> 2.1. REGIONAL GEOLOGIC/HYDROGEOLOGIC SETTING . . . . . . . . . . . . . . . . . 1 <br /> 2.2. UNDERGROUND STORAGE TANK REMOVAL . . . . . . . . . . . . . . . . . . . . . . 2 <br /> 2.3. PREVIOUS SITE ASSESSMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 <br /> 2.4. STRATIGRAPHY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 <br /> 3.0. SCOPE OF WORK . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 <br /> 3.1. PERMITTING AND PRE-FIELD WORK ACTIVITIES . . . . . . . . . . . . . . . . . . . 4 <br /> 3.2. DRILLING AND SOIL SAMPLE COLLECTION . . . . . . . . . . . . . . . . . . . . . . . . 4 <br /> 3.3. MONITORING WELL INSTALLATION, DEVELOPMENT, & SURVEY . . . . 5 <br /> 3.4. GROUND WATER SAMPLING AND ANALYSIS . . . . . . . . . . . . . . . . . . . . . . 5 <br /> 3.5. PREPARATION OF REPORT OF FINDINGS . . . . . . . . . . . . . . . . . . . . . . . . . . 6 <br /> 60 <br /> 4.0. FIELD PROCEDURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 <br /> 4.1. PILOT SOIL BORING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 <br /> 4.2. WELL COMPLETION AND WELL ELEVATION SURVEY . . . . . . . . . . . . . . 6 <br /> 4.3. WELL DEVELOPMENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 <br /> 4.4. GROUNDWATER SAMPLING PROCEDURES . . . . . . . . . . . . . . . . . . . . . . . . 7 <br /> 4.4.1. Static Water Level Measurements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 <br /> 4.4.2. Well Evacuation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 <br /> 4.4.3. Sample Withdrawal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 <br /> 4.4.4. Sample Handling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 <br /> 4.5. EQUIPMENT DECONTAMINATION/WASTE MANAGEMENT . . . . . . . . . . 9 <br /> FIGURES <br /> `r Figure 1 -Location Map <br /> Figure 2 -Site Plan <br /> v. Figure 3 -Site Plan -North Tank Area <br /> Figure 4 -Site Plan -South Tank Area <br /> Figure 5 -Monitoring Well Construction Diagram <br /> Advanced GeoEnvironmental,Inc. <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.