Laserfiche WebLink
, <br /> - <br /> 1{�, 04V December;2001 <br /> AGE_�C Proecf No: OT-0828" ` <br /> ' Page 3,of 6 .; <br /> 2_.4. <br /> GROUND WATER DEPTH' <br /> ANLL FLOW DIRECTION <br /> Eased`on,revieW ofthe,L <br /> Ines of Equal Depth to Gra'undwater;.'F 4 <br /> all 1999 <br /> Joaquan CoiintyFlood Control District and Water ' map,published by•the San s <br /> 'depth to ound vv Conservation Districi(FCD&WCD),the estimated r, <br /> kr ater avihe' site is befween 40 and 50 feet below surface .Rr. <br /> historical ground water depth may-have been between 70 and 80 feet bs grade �bsg) However, , <br /> g:"Diii ing the October 2001 + <br /> • investigation; depth.to first encountered ground water ivas�a ro -� _ <br /> pts . ximately 55'feet-ljsg: <br /> Review of the mall Lines'of Equal.Elevation o Grou' A <br /> ndwater, Fall:I999'(FCD&WCD).depicts`the , <br /> regtoial ground water:t?a�v direction towards the riortheasi. <br /> PROCEDURES i <br /> On 04 and 05 October,200 four soil robe bo <br /> part of the site assess rings (P-I through P-4)were advanced at"the site' <br /> merit related to'former I ISTs- The field work was.conducted as-outlined iri the , <br />'. AGE Prepared, Preliminary Site Assessrraent TYcirk Plan <br /> , dated 02'May'2QO l_ <br /> 31 DPILLING a <br /> ACTIVITIES <br /> Probe' borings P-1'thz ough P-4 here advanced utilizin a <br /> with 1.125_'in6h,diameter probe rods WMg'"direct,push'�technology. Probe.bo�probe 5400 equipped , <br /> vertically to a depth of 48 rzrlg P-1 was advanced' <br /> feet bsg for collection ror soil and ab <br /> ;refusal at;4S,feet=bs reverted ground water samples.. Howevea', <br /> P ;further advancMent of the sapling rods and a water;saznple'could '•' <br /> haat be collected. Boring P:'2 was advancedto'65,fe�t bsg,for collection ofsoii and ab''ground saz�nples, borings,P;3'and P-�#were. ed verti d water,, <br /> .1 acivanc tally to a.depth of20 feet bsg for.collection of <br /> 1r ... p es. ., , _ • „ ,-., - , ,. - sail ',,... <br /> Ir 1 � ' 1 7 •''4, <br /> W3.1 1 ; Sorb Sample Collection <br /> Soils F;Id <br /> amples were'.coIlected at foot intervals .to total depth in borings p 1, P_3., p_4.,Soil <br /> samples were collected'from boring;P-2 at 5400t intervals from-5 feet bsg-to feet bs . E <br /> sample'was collected utilizing a 1.125" Geoprobe soifsamplirig assembly loaded`witfi four six-inch <br /> brass.sleeve's:.After collection, the ends ofthe'second brass sleeve were covered`,with Teflon sheets' <br /> capped and se,'aled,vvith tape. Each.sample sieeve was labeled-with soil robe bo <br /> .time,,date and sampler's'initials and then - . . . nng location; depth, <br /> placed in a chilled colitainer. <br /> Advanced GeuEnvjr r <br /> - - '• . ', 7 anmental,Inc:: . <br />