Laserfiche WebLink
'02 May2001 ` <br /> •- GE-NC Project No: 01'-0828. <br /> A <br /> c Page 6 of 6 <br /> I _ , - . :. .. - -. , - .. ::fir. . . •. . , • .. - <br /> 4.2: ,'SOIL-SAMPLE COLLECTION AND ANALYSIS <br /> `Soil will be�sampled from the four borings at 5'.foot'inte ' als begimmng at 5'feet bsg using a 1.125 <br /> Geopr`obe soil sampling_assernblyloaded•with,four six-inch brass sleeves.Upon sample retrieval; <br />'. the ends of the second sleeve will be covered with Teflon sheets;capped and sealed with tape. Each <br /> sample sleeve will be,labeled with the boring designation,- depth,-time, date and sampler's initials. <br /> _ Appropriately sealed and labeled samples will be placed ria chilled container on ice and transported <br /> under chain-of-custody procedure to a DHS-certified laboratory. Soils encountered in the borings <br /> will.be visually,classified by an AGE geologist-in accordance with the Unified Il Classification <br /> :System(USCS).Additionally,soil.samples will be field screened for the presence ofvolatile organic. <br /> .•compoundsusing an OVM. <br /> 4.3. GROUND WATER SAMPLING PROCEDURES <br />' For the collection of`.grab'ground water samples,selected probe borings will be advanced to a depth' <br /> of four feet below the ground water surface. `Grab' ground water samples'wili be;collected using a <br /> Geoprobe water sampling'assembly with a pre-cleaned 0.01 slotted PVC screen. Groundwater <br />' samples will'be extracted with a'positive displacement Teflon sample tubing and'ball bearing <br /> assembly inserted through the hollow center of the push rods into the screened section.The samples;,, <br /> ;will be collected,in laboratory-supplied, 40-m1 VOA vialls containing 0.5 ml hydrochloric.acid,as <br />' sample preservative; 1-liter amber bottles and plastic bottles.'The labeled bottles will be placed in <br /> a chilled container under ice and transported under chain-of-custody to a DHS-certified laboratory. <br /> 4.4. 1 EQUIPMENT DECONTAMINATION <br /> Prior-to use;all sampling tools used for sample collection will be thoroughly rinsed with clean water <br /> after being washed :with a, solution. of Alconox. All probing rods will:be" cleaned prior to <br />' advaneement at=each-probe boring location.' <br />' 4.5. 'BORING ABANDONMENT <br /> rAll'probe*borings will-be permanently sealed to-prevent yertical migratiohi of contaminants: Soil i <br />' borings shall be abandoned bybackfilling.with portland from the total:depth to surface grade. <br /> Advanced GeoEnvironmentai,Inc. <br />