My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BROADWAY
>
1705
>
3500 - Local Oversight Program
>
PR0544127
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2019 4:41:12 PM
Creation date
2/8/2019 4:33:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544127
PE
3528
FACILITY_ID
FA0009518
FACILITY_NAME
GEORGE F SCHULER INC
STREET_NUMBER
1705
Direction
N
STREET_NAME
BROADWAY
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
14315007
CURRENT_STATUS
02
SITE_LOCATION
1705 N BROADWAY AVE
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FWkF Environmental 'Consultants, Inc. <br /> Post Office Box 6729 <br /> i5_", <br /> T1. Modesto, CA 95355-6729 <br /> R � EA&ZE I V!E U (209) 579-8138 <br /> JAN 0 8 19193 <br /> ENVIRONMENTAIL HEALTH <br /> PERMIT/SERVICES <br /> January 4, 1993 <br /> Steven K. Schneider <br /> Senior Envit6hrfi6hial fl7ealth Spr-i6 X <br /> San Joaquin County Public Health Services <br /> P.O. Box 2009 <br /> Stockton, California 95201 <br /> RE: George Schuler Inc., 1705 N. Broadway, Stockton, California95205 <br /> 1 <br /> During the week of December 14, 1992, VVBF started the work as described in our <br /> remedial work plan dated November 25, 1992. Boring B-I was drilled to a depth of 45 <br /> feet and tempora.-ily abandoned, per our discussion, pending labor6ory results. Due to <br /> the concentrations of benzene at thds depth we propose to proceed with the boring and <br /> installation of the vapor extraction/monitoring well as described 'in the work plan. <br /> I I <br /> Scheduling an available driller may take a week or two. Verbal notification will be:given <br /> 48 hours prior to drillingr. <br /> Shicc.rely, <br /> Michael J. Kloberdanz <br /> WFIF Eta-vironnwntal Consu is, lite. <br /> cc: George Schuler, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.