Laserfiche WebLink
3rd Quarter 1995,Quarterly Monitoring Report <br /> Former PureGroBrea Facility <br /> • 1905 North Broadway Avenue,Stockton,California <br /> Sierra-pacific Project No.94-055.04 <br /> 5.0 REMARKS AND SIGNATURES <br /> [ Conclusions and the approach to the work contained in this quarterly monitoring report <br /> represent our professional opinions. These opinions are based on currently available client <br /> information, and were developed in accordance with currently accepted hydrogeologic and <br /> engineering practices. Other than this, no warranty is implied or intended. <br /> SIERRA-PACIFIC GROUNDWATER CONSULTANTS, INC. <br /> I <br /> This quarterly monitoring report was prepared by: <br /> John Giorgi Date <br /> Senior Geologist <br /> This quarterly monitoring report was reviewed by: <br /> _ 9`Io <br /> Jo to en R pp, CEG-1133' Date <br /> .. .Se Engineering Geologist <br /> ,,1Nk�11�a1l1,f <br /> V15RDQ P-M5aai7s5iri AjG <br /> Sierra Pacific Groundwater Consukants 7 <br />