My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000942
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BROADWAY
>
1705
>
3500 - Local Oversight Program
>
PR0544127
>
ARCHIVED REPORTS XR0000942
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2019 4:50:34 PM
Creation date
2/8/2019 4:35:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000942
RECORD_ID
PR0544127
PE
3528
FACILITY_ID
FA0009518
FACILITY_NAME
GEORGE F SCHULER INC
STREET_NUMBER
1705
Direction
N
STREET_NAME
BROADWAY
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
14315007
CURRENT_STATUS
02
SITE_LOCATION
1705 N BROADWAY AVE
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GEORGE SCHULER INC. <br /> 1705 N. Broadway, Stockton, California <br /> Remedial Excavation Report <br /> 1.0 PROJECT IDENTIFICATION <br /> This project involved the removal of oil contaminated soil caused by an underground <br /> storage tank release at the property at 1705 N. Broadway in Stockton, California (Figure <br /> 1). The remedial excavation work included confirmation sampling of the floor and <br /> sidewalls of the excavation. <br /> 1.1 Site Description and History <br /> On August 27, 1992 SEMCO, under permit, removed two (2) underground <br /> gasoline storage tanks along with the associated piping. Soil samples taken at 15 <br /> feet in depth disclosed high concentrations of gasoline, Benzene, Toluene, <br /> Xylenes, and Ethyl Benzene(BTX&E). <br />'. A Re-Excavation Work Plan, dated October 7, 1992, was submitted by SEMCO <br /> to the San Joaquin County Environmental Health Department. The work plan <br /> proposed an excavation 25 by 25 feet wide to a maximum depth of 30 feet and <br /> logged by WHF Environmental Consultants' registered geologist. <br /> 2.0 SCOPE OF WORK <br /> On October 27, 1992 SEMCO re-excavated the former underground tank faciliry at <br /> George Schuler's. WHF screened the soil with a portable PID and logged the excavaxion. l <br /> Highly contaminated soils were encountered during the excavation but appeared to beu� I <br /> intermittent and layered instead of decreasing in concentration consistently with depth. At <br /> a depth of 30 feet gasoline odor was still present in the soil from the floor and sidewalls of <br /> the excavation. The excavation was terminated at this depth and samples were taken, <br /> under the direction of the local regulatory agent. The final lateral dimensions of the <br /> excavation were 21 by 17.5 feet (Figure 2). <br /> 'Soil samples taken, for laboratory analysis, of the side walls at varying depths were non <br /> detect for gasoline and BTX&E. The floor sample taken at 30 feet in depth disclosed <br /> concentrations of gasoline along with BTX(Table 1 & Appendix A). <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.