Laserfiche WebLink
I <br /> i <br /> I <br /> i <br /> u n'' COUNTY OF SAN JOAQUIN <br /> y� DEPARTMENT OF PUBLIC WORKS <br /> P.O.BOX 1810-1810 EAST IiAZELTON AVENUE <br /> :• STOCKTON.CAUFORNW 45201-1810 <br /> ♦ 2M/4A&= SUVEN� t <br /> f .Y X 209/4+8- <br /> s <br /> HEM FAI <br /> August 24,1999 <br /> MEMQHANDUM AUG 241999 Ii <br /> TO: Thomas M.Gau,Senior Civil Engineer Commun4 Development Dept 1 <br /> CommunityDevelopment Department p <br /> CONTACT PERSON: Kai Luoma <br /> FROM: Gabriel Karam,Senior Civil Engineer <br /> Public Services Division <br /> SUBJECT: SA-9942 A SITE APPROVAL APPLICATION FOR FARM EQUIPMENT + <br /> REPAIR WITHIN EXISTING 7,5DO-SQUARE-FOOT AGRICULTURAL ; <br /> STORAGE BUILDING,LOCATED ON THE SOUTH SIDE OF <br /> LONE TREE ROAD,2,400 FEET EAST OF ESCALON-BELLOTA ROAD. <br /> (DISTRICT 5). <br /> APPLICANT: Fernando and Marial Goncalves APN: 229-080-60 <br /> INFORMATION: <br /> The site is not currently located wftHn a Federal Flood Insurance Administration Designated <br /> Flood Hazard Area. I <br /> Lone Two Road has an existing right-of-way width of 62 feet and a planned right-of-way width <br /> 3 of 80 feet. <br /> r 0 "*'A' cmaA710MS: <br /> i <br /> 1. Encroachment permit shall be required for work within road right-of-way. <br /> (Development Tale Sections 9-1145.4 and 9-1145.5) <br /> 2. The driveway approach shall be Improved in accordance with the requirements of <br /> San Joaquin County Standards R-17 prior to issuance of the occupancy permit. <br /> (Development Title Section 9-1145.5) <br /> 3. The Traffic Impact Mitigation Fee will be required for this development. The fee is due <br /> and payable at the time of buiiding permit application. (The fee currently is Ua2.00 per <br /> 1,000 gross ssqquare foot of building as manufacturing in the Escalon area. The fee shall <br /> be automaticaliy adjusted July 1 of each year by the Engineering Construction Cost Index <br /> as published by the Engineenng News Record. <br /> (Resolutions R-90-304,R-91-1025,R-93-187, -94-179,R-95-M and R-98-692) <br /> 4. A copy of the Final Site Plan shall be submitted prior to release of building pen'nit <br /> GIMIMalb gn ; <br /> Pe-onaeea�e <br /> E: Manuel Lopez,Deputy Director/Development <br /> t <br /> s�cS <br /> fl�.•tF'.., w r r 1 <br /> 1 <br />