My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BROADWAY
>
1532
>
2900 - Site Mitigation Program
>
PR0001522
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2019 3:59:22 PM
Creation date
2/11/2019 2:44:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0001522
PE
2951
FACILITY_ID
FA0004051
FACILITY_NAME
UPS - Stockton
STREET_NUMBER
1532
Direction
N
STREET_NAME
BROADWAY
STREET_TYPE
Ave
City
Stockton
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
1532 N Broadway Ave
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PEIF� GROUNDWATER TECHNOLOGY INC. <br /> TECHNOLOGY, 1401 Halyard Drive,Suite 140;West Sacramento;CA 95691,(916)372-4700 <br /> PAX(916)372-8781 <br /> November 7, 1-991 <br /> Mr. Michael Infurna * . <br /> San Joaquin Local Health District <br /> Environmental Health Division NOV 1 2 1991 <br /> 1601 East Hazelton Avenuen 'EALT4 <br /> P.O. Sox 2009 ENVIP)N%" <br /> Stockton, Ca 95201 Fqs,m <br /> ,RE: EXECUTIVE SUMMARY OF STOCKTON FACILITY WORK <br /> Dear Mr. Infurna: <br /> This document represents the response to your request for an:.executive summary detailing the <br /> construction activities at the United Parcel Service Stockton Distribution facility. <br /> 1n August of 1991 United Parcel Service began a� removal ::-and replacement program on two <br /> underground storage tanks at the above referenced facility. The scope of work was to remove and <br /> replace one 10,000 gallon unleaded gasoline tank and:-to remove one 500 gallon waste oil tank. <br /> During the removal process minor amounts of contaminated soil were' encountered in both of the <br /> excavations. As a mitigation measure additional excavation is currently being undertaken at botfi.of <br /> the excavation sites. It is anticipated that following the overexcavation'that all contaminated soil will <br /> have been removed. ,Following the final excavation, a new 101000 gallon double-walled fiberglass <br /> underground storage v I-1-be installed fpr use by the gasoline fueling facility. <br /> if there are any questions or-comments regarding this summary "please"feel free to contact our office <br /> at any time. <br /> Sincerely, <br /> GROU DWATER TECHNOLOGY, INC. v <br /> 5 <br /> aur Odenthal <br /> Envir nmentaljogist <br /> Sta of California <br /> .Registered Environmental Assessor # 02083 <br /> LJ0/rc <br /> Offices throughout the U.S.,Canada and Overseas <br />
The URL can be used to link to this page
Your browser does not support the video tag.