My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0011680
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BROADWAY
>
1532
>
2900 - Site Mitigation Program
>
PR0001522
>
ARCHIVED REPORTS XR0011680
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2019 3:37:29 PM
Creation date
2/11/2019 2:46:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011680
RECORD_ID
PR0001522
PE
2951
FACILITY_ID
FA0004051
FACILITY_NAME
UPS - Stockton
STREET_NUMBER
1532
Direction
N
STREET_NAME
BROADWAY
STREET_TYPE
Ave
City
Stockton
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
1532 N Broadway Ave
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Aa- <br /> UNITED PARCEL SERVICE <br /> W <br /> ite Safety Plan <br /> ctober 7, 1991 <br /> d. Summary: Do not enter the confined space unless: <br /> • the oxygen concentration is between 19. 5 and 23%; <br /> • the LEL is less than 20%; <br /> • PID and/or FID readings are less than 750 ppm (a half <br /> face respirator must be worn above 50 ppm; a full face <br /> respirator must be worn if the readings exceed 100 ppm) <br /> e. Buddy System: The buddy system must be used when the work <br /> in the confined space: (1) requires the person's head to <br /> be below ground level; or (2) the person must work in a <br /> manhole or other space in which an exit may not be easily <br /> accessible. <br /> i <br /> TABLE II <br /> HAZARD SUMMARY <br /> s <br /> PPE AIR MONITORING - BREATHING ZONE <br /> Job Task Level <br /> Instrument Frequency* <br /> Soil boring At start of work and <br /> samples D PID or FID 15 min to continuously <br /> Monitoring D PID or FID At start of work and <br /> Well Installation 15 min to continuously <br /> Monitoring Start-up of work at each <br /> Well Survey D PID or FID well location <br /> Monitoring Start-up of work at each <br /> Well Development D PID or FID well location <br /> Groundwater D PTD or FID Start-up of work at each <br /> and soil sampling well location. <br /> * All air monitoring data must be recorded on the Vapor Monitoring Sheet, <br /> Appendix H. <br /> 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.