My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0011680
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BROADWAY
>
1532
>
2900 - Site Mitigation Program
>
PR0001522
>
ARCHIVED REPORTS XR0011680
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2019 3:37:29 PM
Creation date
2/11/2019 2:46:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0011680
RECORD_ID
PR0001522
PE
2951
FACILITY_ID
FA0004051
FACILITY_NAME
UPS - Stockton
STREET_NUMBER
1532
Direction
N
STREET_NAME
BROADWAY
STREET_TYPE
Ave
City
Stockton
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
1532 N Broadway Ave
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNITED PARCEL SERVICE <br /> Site Safety Plan <br /> ctober 71. 1991 <br /> 3.0 INTRODUCTION <br /> 3. l Background <br /> United Parcel Services has retained Groundwater Technology, Inc. to <br /> perform a excavation work and sampling at their UPS - Stockton facility <br /> located at 1532 North Broadway, Stockton, CA 95205. <br /> Underground tank removed, one large tank hole to be overexcavated and <br /> one small tank hole to be backfilled. <br /> 3 .2 Purpose <br /> The purpose of the site safety plan is to provide Groundwater <br /> Technology field personnel and subcontractors with an understanding of <br /> the potential chemical and physical hazards that exist or may arise <br /> while the tasks of this project are being performed. <br /> This SSP describes the procedures to be followed in order to reduce <br /> employee exposure to potential health hazards which may be present at <br /> the project site. The emergency response procedures necessary to <br /> respond to such hazards are also described within this SSP. <br /> 3.3 objective <br /> The primary objective is to ensure the well-being of all field <br /> personnel and the community surrounding this site. in order to <br /> accomplish this, project staff and approved subcontractors shall <br /> acknowledge and adhere to the policies and procedures established <br /> herein. Accordingly, all personnel assigned to this project shall read <br /> this site safety plan and sign the Agreement and Acknowledgement <br /> Statement (Appendix A) to certify that they have read, understood and <br /> agreed to abide by its provisions. <br /> GTI personnel have the authority to stop work performed by our sub- <br /> contractors at this site if any work is not performed in accordance <br /> with the requirements of this Site Safety Plan. <br /> 3.4 Amendments <br /> Any changes in the scope of work of this project and/or site conditions <br /> must be amended in writing on the Site Safety Plan Amendment Sheet <br /> (Appendix B) and approved by Health & Safety Manager. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.