My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BROADWAY
>
1621
>
3000 – Underground Injection Control Program
>
PR0515035
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2019 3:56:26 PM
Creation date
2/11/2019 3:03:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3000 – Underground Injection Control Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0515035
PE
3030
FACILITY_ID
FA0012021
FACILITY_NAME
WESTERN SQUARE INDUSTRIES INC
STREET_NUMBER
1621
Direction
N
STREET_NAME
BROADWAY
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
1621 N BROADWAY AVE
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C <br /> #� <br /> CITY OF STOCKTON <br /> ENVIRONMENTAL CONTROL <br /> 2500 Navy Dr. Stockton CA 95206 <br /> INSPECTION X <br /> ANNUAL INSPECTION <br /> TELEPHONE CALL <br /> MEETING NOTES <br /> Company: Western Square Industries, Inc. Inspector: Larry Williams <br /> Location: 1621 Broadway Stockton CA 95205 Date: 3-2-99 <br /> Time: 1330 <br /> Contact: Warren Snider, VP Operations Telephone: 444-0921 <br /> IL <br /> _Philip Bartko, Plant Engineer <br /> The purpose of this inspection was to verify the sewage disposal method of Western Square (WS). <br /> WS fabricates, cleans, and powder coats metal farm fencing, wine barrel racks, and water bottle <br /> racks. This industry is a metal finisher and regulated under 40 CFR Part 433.17 for sewer <br /> discharges. <br /> The sanitary sewer line was checked on Report Ave adjacent to WS. No flow was noted indicating <br /> a process wastewater discharge. The storm line was checked at the same location. This manhole <br /> had a lateral coming from the direction of WS, and had soapy wastewater entering the manhole. <br /> A sample was collected from the storm manhole for metals and pH, and sealed with evidence tape. <br /> Contact was made with Snider, and I requested to inspect the plant operations. He contacted <br /> Bartko, and asked him explain the manufacturing process. This company utilizes a three stage <br /> washer to clean and prepare metal pieces for powder coating. The first stage of the unit cleans <br /> the parts in a 3% solution iron phosphoric acid. The second stage is a clear rinse that overflows <br /> back to the first stage as make-up water. The third stage is a clear rinse that overflows and is <br /> pumped to dry wells on site. WS does not have a sewer connection. <br /> The cleaned parts are powder coated various colors and dried in a 450 degree oven. No painting <br /> occurs on site. <br /> Larger parts (water bottle racks) were being pressure washed using a 3% iron phos. solution by <br /> hand on 20' X 20' wash pad. This pad is exposed to stormwater and drains to the dry wells. <br /> No wastewater treatment is done on site. <br />
The URL can be used to link to this page
Your browser does not support the video tag.