Laserfiche WebLink
Valley Water Treatment Page 6 <br /> Corrective Action Plan <br /> GPE Project No.480.3 <br /> December 12,2006 <br /> ' and analytical methods to be used as well as the completion details will be <br /> the same as those used for construction of the original MW-1, as described in <br /> the original Work Plan. <br /> Groundwater Sampling <br /> 5.6 G P g <br /> Upon completion, the replacement well will be developed and sampled in the <br /> same manner as the original well was. <br /> 6.0 REPORTING <br /> ' The information gathered during this phase of work will be presented in a <br /> report, which will include the results of field data, and sample analyses <br /> collected, and their implications. The report will be prepared and signed by <br /> ' the registered professional geologist responsible for the work. <br /> 2937 Veneman Ave.,#B240 Geo-Phase Environmental Inc. Phone(209)569-0293 <br /> Modesto,CA 95356 Fax(209)569-0295 <br /> r <br />