Laserfiche WebLink
r <br /> O <br /> (ANGLE BORING) SB-3 FORMER VENT LINE <br /> °J X=X=X=-X—X—X <br /> X, I <br /> I <br /> FORMER WEED OIL TANK i FORMER DISPENSER <br /> I <br /> i I I <br /> SB-lo <br /> I l SB-2 <br /> { I MW-1 O <br /> BUILDING <br /> I I o/ I FORMER PRODUCT SUPPLY PIPING <br /> L - - <br /> FORMER 500-GALLON GASOLINE UST <br /> 00 <br /> APPROXIMATE LIMITS OF EXCAVATION <br /> WASTE DISPOSAL DRUMS I <br /> I <br />. I <br /> I <br /> X—X— X—X—X <br /> CONCRETE PAD <br /> ® TZ� <br /> SB-4 <br /> O <br /> LEGEND: <br /> ® SOIL BORING LOCATIONS (AUGUST 1997) <br /> MONITORING WELL LOCATION 0 5 10 <br /> O PROPOSED SOIL BORING <br /> SCALE IN FEET 1"=5' <br /> STOCKTON UNIFIED SCHOOL DISTRICT SOIL BORING/ FIGURE: <br /> STAGG HIGH SCHOOL MONITORING WELL LOCATIONS <br /> MAP SOURCE: HELMICK & LERNER; 1621 BROOKSIDE <br /> FIGURE 2 - PROPOSED STOCKTON, CALIFORNIA <br /> LOCATION OF MW-1; 1/98 PROJECT #: 17292.0002 SEPTEMBER 2000 OF 3 <br />