Laserfiche WebLink
ATC WE SAMTY PLAN <br /> .i <br /> PERSONAL PROTECTIVE EQUIPMENT <br /> fl ;� <br /> As a minimum Level D protection is required on all ATC worksites. ''Level D includes: <br /> I" <br /> Steel toed boots 3I <br /> Safety Glasses <br /> Hard Hat <br /> For each task on this project, identify additional protectivegarments as required, include the <br /> conditions under which the level of PPE would be modified for each task. <br /> Task(s� Con ition 1]ersonnel Garments <br /> Working Near Vehicle Orange Vests 4 <br /> 1 >20 ppm for 5 minutes in Face Respirator <br /> ,k <br /> 1 >200 ppm for 5 minutes Evacuate Site Full Face Respirator <br /> I <br /> SITE CONTROL AND COMMUNICATIONS <br /> v <br /> The buddy system must be used on all ATC hazardous waste�'sites. 'i <br /> 31 <br /> Site will be secured as follows: Fencing will be used when possible. <br /> I� <br /> i <br /> Work Zones will be marked as follows: Orange cones or,barricades and caution tape will be <br /> used to mark off work 'zone where traffic is present. <br /> 'k <br /> ,1 <br /> MARK WORK ZONES ON SITE MAP L7 CHECK WHEN DONE.: <br /> I it <br /> E ' <br /> i 1 <br /> PAGE 10 <br /> t <br />