My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BROOKSIDE
>
1621
>
3500 - Local Oversight Program
>
PR0544129
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2019 4:57:02 PM
Creation date
2/11/2019 4:24:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544129
PE
3528
FACILITY_ID
FA0001719
FACILITY_NAME
SUSD-STAGG HIGH SCHOOL
STREET_NUMBER
1621
STREET_NAME
BROOKSIDE
STREET_TYPE
RD
City
STOCKTON
Zip
95207
APN
11009004
CURRENT_STATUS
02
SITE_LOCATION
1621 BROOKSIDE RD
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 <br /> A. T�T <br /> F <br /> a <br /> ATC Associates Inc. , <br /> Quality Assurance/Quality Control Plan <br /> Revised March 1998 <br /> iI <br /> I.� <br /> This sample will be immediately placed into a cooler containing dry ice or frozen chemical ice. <br /> A "high-low" temperature recording thermometer will accompany sample shipments to ensure <br /> �I ,E <br /> proper temperature maintenance. The samples will be delivered to a state certified laboratory <br /> r following under chain-of-custody protocol within 48 hours of sampling, whenever possible. <br /> Soil in the uppermost brass tube will be described according'to ASTM standard practice for <br /> I <br /> description and identification of soils (ASTM D-2488,84). Stratigraphic, genetic and other <br /> data/interpretations will also be recorded. Soil properties may also be determined from the <br /> i <br /> middle brass tube and from the sampler shoe. Alternatively!,the second sample tube may be <br /> i11 <br /> used with the uppermost tube for preparation of duplicates. These field observations will be <br /> noted on a log prepared for each boring/well. <br /> During sampling, latex gloves will be worn to prevent cross-contamination with other samples. <br /> I <br /> The disposable gloves will be discarded after collecting samples from each 18-inch sample <br /> e <br /> { drive. f <br /> # I <br /> Soil samples will be collected at 5-foot intervals, at significant changes in lithology and intervals <br /> of obvious contamination in order to develop a complete profile of soil contamination. <br /> i 11.2 Sample Collection During Tank Removal <br /> ' Soil samples will be collected as soon as possible after removal of the tank. Where feasible, all <br /> y preparations for soil sampling will be made prior to tank removal. Soil samples collected from <br /> i � <br /> a backhoe bucket or directly from the excavation floor will be collected in a thin-walled <br /> II ,I <br /> stainless steel or brass cylinder at least 3-inches long by 1-inch in diameter. From 3 to 24- <br /> I !� <br /> I C <br /> 1 W:1Admin\Shells\QAQC-98.DOC <br /> J� <br /> i <br /> I <br /> 4' <br /> { I I <br />
The URL can be used to link to this page
Your browser does not support the video tag.